[C] 500088 Master Data for DM Define Scheduling Parameters for Production Orders Flashcards

1
Q

What can you use this configuration item for?

500088 Master Data for DM Define Scheduling Parameters for…

A

You can use this configuration item to define the parameters for scheduling production orders per plant, order type, and production supervisor. This includes detailed scheduling, date adjustment when dates are exceeded, scheduling control for detailed scheduling, and reduction.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What do you define in detailed scheduling?

500088 Master Data for DM Define Scheduling Parameters for…

A

In detailed scheduling you define:

  • How production dates are to be calculated
  • Whether capacity requirements are generated

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What do you specify in date adjustment?

500088 Master Data for DM Define Scheduling Parameters for…

A

In date adjustment you specify whether and how the basic dates are adjusted to the production dates (for example, when deadlines are exceeded) and how dates for dependent requirements are to lie.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What do you specify in scheduling control?

500088 Master Data for DM Define Scheduling Parameters for…

A

In scheduling control for detailed scheduling you specify the control parameters for detailed scheduling.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What do you specify in the scheduling type?

500088 Master Data for DM Define Scheduling Parameters for…

A

Here you specify in which direction scheduling is to be carried out and whether it is to be carried out to an exact time. Among other things you can specify that a scheduling run only be used to generate capacity requirements.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What do you specify with “Start date in the past”?

500088 Master Data for DM Define Scheduling Parameters for…

A

Here you specify how many days an order may lie in the past before today scheduling is triggered.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What do you specify with “Calculate dates automatically”?

500088 Master Data for DM Define Scheduling Parameters for…

A

Here you specify whether scheduling is carried out automatically on saving.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What do you specify with “Display log automatically”?

500088 Master Data for DM Define Scheduling Parameters for…

A

Here you specify whether the log is displayed automatically on scheduling.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What do you specify with “Required date of material”?

500088 Master Data for DM Define Scheduling Parameters for…

A

Here you specify where the required date of a component should be with respect to an operation.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What do you specify with “Schedule exact to the break”?

500088 Master Data for DM Define Scheduling Parameters for…

A

Here you specify that the exact time a break occurs must be taken into account.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What do you specify with “Dates to be specified”?

500088 Master Data for DM Define Scheduling Parameters for…

A

Here you specify that when you create or change an order the user must enter schedules dates (production dates) instead of basic dates.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What do you specify with “Move order”?

500088 Master Data for DM Define Scheduling Parameters for…

A

Here you specify whether the order can be moved if partially confirmed operations existt

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What do you specify in “Reduction”?

500088 Master Data for DM Define Scheduling Parameters for…

A
  • Whether in the order or in the collective order all the operations are to be reduced or only those along the critical path.
    Reduction along the critical path is only possible for networks, production orders and planned orders with parallel sequences and for collective orders that contain production orders or planned orders.
  • Up to which maximum reduction level the reduction takes place
  • To what percentage the float before and after production in every reduction level is to be reduced.

500088 Master Data for DM Define Scheduling Parameters for…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly