- Properly test or verify that equipment is de-energized before beginning dead work.
- Permits
- Operating/Work permits: only perform work within the scope of work listed on work permit
- Do not change status of piece of equipment with Stop Tag
- Follow sequence of operating orders - Atmospheric Testing
- Perform atmospheric testing before entering and while working in an enclosed or permit-required confined space
- For excavations > 4’ deep, atmosphere shall be tested prior to entry or while excavation is not already occupied - Rescue/Retrieval
- Entrant and attendant are required to wear rescue harness when working in enclosed spaces - High Hazard Energy PPE
- Use fall protection equipment as required
- Use appropriate rubber gloves, rubber sleeves, FR clothing and eye protection/face shield as required for electrical hazard - Sheeting/Shoring
- Ensure excavations 5’+ are properly sheeted and shored prior to entry
2
Q
RLWB Overview
A
- Verify Dead/Lockout-Tag Out
- Permits
- Atmospheric Testing
- Rescue/Retrieval
- High Hazard Energy PPE
- Sheeting/Shoring
3
Q
- Verify Dead/Lockout-Tag Out
A
- Properly test or verify that equipment is de-energized before beginning dead work.
4
Q
- Permits
A
- Permits
- Only perform work within the scope of work listed on work permit
- Do not change status of piece of equipment with Stop Tag
- Follow sequence of operating orders
5
Q
- Atmospheric Testing
A
- Atmospheric Testing
- Perform atmospheric testing before entering and while working in an enclosed or permit-required confined space
- For excavations > 4’ deep, atmosphere shall be tested prior to entry or while excavation is not already occupied
6
Q
- Rescue/Retrieval
A
- Rescue/Retrieval
- Entrant and attendant are required to wear rescue harness when working in enclosed spaces
7
Q
- High Hazard Energy PPE
A
- High Hazard Energy PPE
- Use fall protection equipment as required
- Use appropriate rubber gloves, rubber sleeves, FR clothing and eye protection/face shield as required for electrical hazard
8
Q
- Sheeting/Shoring
A
- Sheeting/Shoring
- Ensure excavations 5’+ are properly sheeted and shored prior to entry