RHR Flashcards

1
Q

How the Residual Heat Removal
System is affected by the loss of the
Component Cooling Water System?

A

~Loss of CCW to RHR pump mechanical seal cooler
results in elevated seal temperatures (inability for
RHRS to remove heat from RCS).

~Loss of CCW to RHR heat exchangers results in
loss of RHR cooling capability.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the RHR Pump trips?

A
~Low-Low RWST level if individual pump 
suction valve (IMO-310/320) from RWST is 
open.
~Overload/Overcurrent.
~Loadshed.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the AEO actions for responding to a gas bound RHR pump?

A

~Vent RHR Pump Mechanical Seal Heat Exchanger
at RH-107E(W).
~Vent RHR Pump Suction at RH-138, RHR Pump
suction after loop seal.
~Vent RHR Pump Casings.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How long do you have to vent an RHR pump casings?

A

30min.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the flow paths through an RHR heat exchanger?

A

~RCS through the tubes.

~CCW through the shell.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the discharge pressure of an RHR pump?

A

~ 150psi.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

List emergency phases for RHR.

A
Safety injection.
Cold leg recirculating.
Hot leg recirculating.
RHR supplemental spray.
Supply suction water to charging, safety injection, and containment spray.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

List normal operations for RHR.

A

Outage residual heat removal.
Low temperature over pressure protection (LTOP).
Transferring water to refueling cavity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is suction sources for RHR?

A

Normal RWST.
ALT. Loop 2 Hot leg.
Recirculating phase containment recirculating sump.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the RHR flow path for normal cool down?

A

From loop 2 hot leg through pumps, heat exchangers, and crosstie, through ICM-111 to Loops 2 & 3 cold leg.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the RHR flow path for Alternate cool down?

A

From loop 2 hot leg through pumps, heat exchangers, and crosstie, through IMO-316/326 to loops 1,2,3, and 4 cold legs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the RHR pump auto starts?

A

Safety injection.

Blackout sequence.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the RHR flow when refilling the reactor cavity.

A

From loop 2 hot leg and the RWST, through pumps, heat exchangers, and crosstie, through ICM-111 to Loops 2 & 3 cold leg.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the RHR flow path for reactor cavity drain down?

A

From loop 2 hot leg through pumps, heat exchangers, and crosstie, through RH-130 return to RWST, and through ICM-111 to Loops 2 & 3 cold leg.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the purpose of the RHR system?

A
~Remove heat energy from the core and 
reactor coolant during plant cool down, 
cold shutdown and refueling operations.
~Transfer water between the Refueling 
Water Storage Tank and the Refueling 
Cavity at the beginning and end of 
refueling operations.
~Provide Low Temperature Over Pressure 
(LTOP) protection for the RCS.
~Inject borated water into the RCS when 
pressure decreases below the shutoff head 
of the RHR pumps.
~Provide water to the SI pumps and CCP's 
during the recirculation phase of safety 
injection.
~Provide supplemental containment spray.