Review Flashcards
The item number on the DA Form 5988 is where the _______ item number that applies to the fault
PMCS
When submitting a maintenance request, the piece of equipment won’t be accepted until this is filled in: ____________
Accepted by and status
When filling out a 5988 is must have:
Miles / KM
Hours
1st operators signature
When will a WARNO be issued?
After the PL determines a platoons mission and time for planning
What is included in Step 6 of the TLP?
The commanders intent and platoons intent put into an OPORD
What is included step 1 in the TLP?
Determining the units mission METT- TC
What is the only form authorized to record operators qualifications?
DA Form 348
What is the DA Form 5987-E-1?
Alert motor Equipment dispatch
What is the Roll and cross roll of the AMG?
+/- .5 degrees roll
+/- 10 degrees cross roll
What is the minimum and max distance from the RS to local LS?
120 M - 1200M
What is the distance of the TFOCA II?
500 m
What is the area required to emplace a launcher?
6 M - 15 M
What is the distance of all launchers?
Local LS: 120 M -1200M
RL 1: 1200 M - 10 Km
RL 3: 6 km - 30 KM
What is the PTL of local launchers and RL 1 and RL 3 launchers?
Local: +/- 80 degrees
RL 1: +/- 60 degrees
RL 3: +/- 60 degrees
What degrees of elevation impeded missile acquisition?
RS to LS: exceeding 2.0 degrees (local)
RL 1 and RL 3: exceeding 0.5 degrees (remote)
What are the 5 paragraphs of an OPORD?
Situation Mission Execution Sustainment Command and signal
Which paragraph of an OPORD includes the 5 W’s?
Para 2
Mission
What is included in step 8 (supervise and refine) in TLP?
PCCs / PCIs
True or False: after PMCS the crew chief or supervisor will verify that admin data is correct
False: supervisors must verify admin data prior to execution of PMCS DA PAM 750-8
What is included in paragraph 2 of an OPORD?
Mission essential task and 5 Ws
What happens in step 3 of TLP?
Developing a plan in a time constrained environment (make a tentative plan)
True or False: In step 3 of TLP, the PL will develop COAs and select the best one to execute
False: only 1 COA will be developed
Why is MX documentation critical?
Training cannot happen if mission essential equipment is NMC
Which level of MX is closely associated with these obsolete levels of MX “direct and organizational”?
Field