Quiz three prep Flashcards

1
Q

Annex material is for…

A

explanation of the codes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Why is the commentary included in that handbook?

A

To assist in applying the provisions of the code

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

is commentary enforceable?

A

no

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Where does NFPA54 start covering the piping system

A

Point of delivery

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Where is the normal point of delivery on a natural gas System

A

The outlet of the meter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Where is the normal point of delivery on a propane System

A

Outlet of the second stage regulator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What code covers everything upstream of the second stage regulator

A

NFPA58

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The 3 references available to technicians for information

A

(1.1.2) I&O, serving gas supplier, State fuel gas code modifications

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

If a past system was installed up to code and is not up to new code are you required to make changes?

A

1.3 (retroactivity) Negative unless the safety risk is posed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Who should be asked of there is a question on retroactivity (old system) exist?

A

AHJ local inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Define AHJ

A

individual responsible for enforcing the requirements of a code or standard, and responsible for approving equipment, materials, and installations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Listed

A

equipment, or materials that have been tested and found suitable for a specific purpose (found on a list stating such)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Labeled

A

equipment, or materials that have been tested and found suitable for a specific purpose (found on a list stating such and has an attached label)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What does Shall mean

A

You will fucking do it

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The difference between accessible and readily accessible

A

accessible - reachable with removal of panel, door or other covering
readily available - direct access no removal of anything

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Define Qualified agent

A

Person responsible for installation, testing, repairing and replacing gas piping or appliances/equipment, who is experienced in such work, and familiar with all required precautions and requirements of the AHJ

17
Q

Who shall perform installations, testing aND replacement of gas piping, appliances, accessories, and repair and servicing of equipment

A

A qualified agent

18
Q

What must a qualified agent do before turning off Gas to a consumer

A

Notify the consumer

19
Q

Must you always notify the consumer before interrupting service

A

No not in the case of emergency

20
Q

CPN ___ If working on a system and you’re unable to complete the work before leaving for the day what must be done?

A

CPN 4.2.2 states you MUST Leave the system in a safe condition, all pipes and valves must be plugged, and shut off valves should be tagged “out of service”

21
Q

CPN 5.1 states

A

Gas piping plan/sketch may be required by ahj

22
Q

Building layout will include

A

Piping route and location of appliance

23
Q

What is mbh

A

1000 btu’s (used for lp sometimes for ng)

24
Q

information received from serving gas supplier

A

Contact info, available supply pressure, pod

25
2 types of piping diagrams
Straight line and isometric (ISO is best)
26
Information required by code on a diagram
Pod Locations and size of piping location of appliances Load and appliance demands
27
Additional info on diagram not required
Length of branches Total length of pipes Total demand
28
Which CPN states that a gas piping plan/sketch may be required by ahj
5.1
29
what is stated in CPN 4.2.2
CPN 4.2.2 states you MUST Leave the system in a safe condition, all pipes and valves must be plugged, and shut off valves should be tagged "out of service"