Quiz 5 Flashcards
Which three of the following are some of the Outputs from the Implementation process?
Implementation traceability
System elements
Implementation strategy
What is the purpose of the Tailoring Process?
adapt the processes of [ISO/[EC/IEEE 15288] to satisfy particular circumstances or factors.
Which three of the following are main activities done during the Human Resource Management process?
Develop skills
Identify skills
Acquire and provide skills
The activity “Manage results of transition,” within the Transition process includes the step, “Provide baseline information for configuration management.” Which three of the following are the other steps in the activity?
Post-implementation incidents and problems are captured and may lead to corrective actions or changes to the requirements.
Record anomalies observed during the transition process.
Maintain bidirectional traceability of the transitioned system elements with the transition strategy, system architecture, design, and system requirements.
Which three of the following are main activities done during the Validation process?
Perform validation
Prepare for validation
Manage results of validation
Which three of the following analyses may be used when performing Supportability analysis?
Reliability Block Diagram (RBD) Analysis
Failure Modes, Effects, and Criticality Analysis (FMECA)
Fault Tree Analysis (FTA)
Which three of the following are some of the Inputs into the Maintenance Process?
Life cycle concepts
Operator/ maintainer training materials
Validated system
What two outputs from the Transition Process are inputs into the Validation Process?
Installed system
Transition constraints
Transition report
An integrated systems approach for solving complex problems needs the combination of what three disciplines?
Systems Engineering
Systems Thinking
Systems Science
What three outcomes can manufacturing firms anticipate when using Design for Six Sigma or lean manufacturing?
lowering maintenance activities
improving process control
reducing production inspections
Which three are some of initial planning efforts for information management that are defined in the Information Management Plan?
establishes the scope of project information that is maintained
defines the information management tasks to be performed
identifies information management tools and processes
Which three of the following are some of the Outputs from the Decision Management process?
Decision report
Decision management strategy
Decision record
What is the purpose of the Maintenance Process?
sustain the capability of the system to provide a service.
What term is used for “the physical means or equipment for facilitating the performance of an action, eg buildings, instruments, tools?
Facility
Which four of the following are some of the primary objectives of decision gates?
Continue to foster buyer and seller teamwork
Ensure that the risk of proceeding to the next step is acceptable
Synchronize project activities
Ensure that the elaboration of the business and technical baselines are acceptable and will lead to satisfactory verification and validation