Quiz 4 Flashcards
Which three of the following are some of the inputs to the Project Assessment and Control Process?
Quality management (QM ) corrective actions
Configuration baselines
Project schedule
Which three of the following are some of the six generic life cycle stages?
Support
Concept
Production
Which three of the following are some of the characteristics that can be helpful when deciding if a particular System-of-interest can be better understood as an System-of-Systems?
Operational independence of component systems
Evolutionary development processes
Geographical distribution
What three outputs from the System Requirements Definition Process are inputs into the Architecture Definition Process?
System function definition
Updated Requirements Verification and Traceability Matrix (RVTM)
System requirements
Which three of the following are Outputs from the Acquisition Process?
Acquisition record
Accepted system or system element
Request for Supply
Which three of the following are some of the inputs to Implementation Process?
Design traceability
Life cycle concepts
Interface definition
What two outputs from the Validation Process are inputs into the Operation Process?
Validation report
Validated system
What is the purpose of the Supply process?
to provide an acquirer with a product or service that meets agreed requirements
Which three of the following are essential properties of a systems thinker?
Identifies the circular nature of complex cause-and- effect relationships
Considers an issue fully and resists the urge to come to a quick conclusion
Seeks to understand the big picture
Which four of the following are steps in the activity “Finalize the disposal,” within the Disposal process?
Maintain documentation of all disposal activities and residual hazards.
Confirm no adverse effects from the disposal activities and return the environment to its original state.
What is the purpose of the Business or Mission Analysis process?
define the business or mission problem or opportunity, characterize the solution space, and determine potential solution class(es) that could address a problem or take advantage of an opportunity.
What is the purpose of the Decision Management process?
to provide a structured, analytical framework for objectively identifying, characterizing and evaluating a set of alternatives for a decision at any point in the life cycle and select the most beneficial course of action.
Which three of the following are some of the inputs to Implementation Process?
Life cycle concepts
System architecture description
System element descriptions
What term is used for “An organization or an individual that enters into an agreement with the acquirer for the supply of a product or service?”
Supplier
A Requirements and Validation Traceability Matrix may be used to record data such as validation action list. Which three of the following are also included in the matrix?
the expected results of the validation action to be performed
selected validation method/technique to validate implementation of every engineering item
the obtained results when a validation action has been performed
Which three of the following are some of the Organizational Project-Enabling Processes named in ISO/IEC 15288?
Portfolio Management Process
Quality Management Process
Life Cycle Model Management Process
Within the discipline of safety engineering, there are numerous best practices within the industry. What three of the following are just some of the analysis techniques and safety engineering artifacts considered best practice?
Functional hazard analysis (FHA)
Probabilistic risk assessment (PRA)
Operations and support hazard analysis (O&SHA)
Which one of the following is the definition of Commercial Off-The-Shelf (COTS)?
Commercial items that require no unique acquirer modifications or maintenance over the life cycle of the product to meet the needs of the procuring agency
Which four of the following are common characteristics of Configuration Item (CI)?
Replaceable as an entity
Defined functionality
Unique specification
Formal control of form, fit, and function
Which of the following three are included in the Lean Development Principles?
perfection
value
low