Quality Management (23) Flashcards

1
Q

The placement of quality concrete will require special measures when the outdoor ambient temperature exceeds:

A

90 degrees

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The application of a planned and systemic program that demonstrates that quality control practices and tests are being effectively implemented is called:

A

Quality assurance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Concrete air-entraining agents are primarily used for:

A

Increasing the concrete’s resistance to freezing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the most important factor that would indicate to the CM that the owner’s team has a significant interest in achieving high quality on the constructed project?

A

Clear and concise requirements for inspection and testing in the contract documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Who is solely responsible for the quality of the work?

A

Contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The Agency CM’s role in addressing non-conformances and corrective actions involves:

A

Inspecting the rework to ensure it was performed per the corrective action section of the non-conformance report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Who has the primary responsibility for delivering a project in accordance with the contract documents?

A

The contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Construction quality control is important to a CM who is responsible for determining:

A

Whether proposed project components conform to the drawings, specifications, and applicable standards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

An implied warranty is usually provided by the:

A

Owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When the CM is providing inspection services, which plan should be consulted to ensure that the contractor complies with the required inspection services?

A

Quality Management Plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In determining the consistency of freshly made concrete, which of the following tests are usually conducted?

A

Slump test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the regular length of time for concrete to harden to its optimal strength under normal conditions?

A

28 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The project owner considers quality to be the highest priority, followed by cost and schedule. You are concerned about the level of quality specified in the contract documents, and whether or not the owner’s expectations will be met. Which of the following is the most important?

A

Verification that materials and workmanship are installed in accordance with the approved submittals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the process entitled to verify and document the performance of mechanical, electrical, and other systems?

A

Commissioning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Final review and verification of construction scope, schedule and quality requirements by the parties should be conducted at the:

A

Pre-award conference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The process of evaluating the construction documents for clarity, consistency, completeness, and ease of construction to facilitate the achievement of overall project objectives is called a:

A

Constructibility review

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What does the Construction Manager use and establish to keep the team informed about the overall status of the project?

A

Management information systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Who is responsible for evaluating the contractor’s quality assurance/quality control program against the quality standards specified in the contract?

A

CM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Which of the following written plans outlines a project’s scope, organization and the specific approach that the CM will take to accomplish the various management tasks?

A

Construction management plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Who is responsible for implementation of the quality control requirement during construction?

A

Contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

The 7 day test results from the cylinder breaks for a major concrete placement indicate that the concrete strength is below the minimum psi specified at 7 days. What should the CM do?

A

Reference the test results in daily reports and wait to receive the 14, 28 and 56 day break results, if necessary; closely monitor design mixes and delivery tickets for compliance with specified strength for the next placements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

On which of the following sets of principles is value engineering based?

A

Organized review, a function-oriented approach, and creative thinking

23
Q

During the design phase, the CM should perform which of the following activities?

A

Obtain owner’s authorization for design scope or criteria changes

24
Q

Which of the following is part of a quality management plan?

A

Overall project organization

25
Q

Which of the following items are included in a quality management plan?

A

Project and owner quality assurance organization, management decisions levels/authority

26
Q
A
27
Q
A
28
Q
A
29
Q
A
30
Q
A
31
Q
A
32
Q
A
33
Q
A
34
Q
A
35
Q
A
36
Q
A
37
Q
A
38
Q
A
39
Q
A
40
Q
A
41
Q
A
42
Q
A
43
Q
A
44
Q
A
45
Q
A
46
Q
A
47
Q
A
48
Q
A
49
Q

During which phase should the construction manager meet with the owner to establish the owner’s quality requirements?

A

Pre-Design phase

50
Q

A _____________ organizes, tracks, and distributes design progress submissions for each individual contract as well as plans after bids are received and change order plans during construction.

A

Document control system

51
Q

In which phase does a constructability review occur?

A

Design phase
(30%, 60%, 90%, 100%)

52
Q

A _____________ occurs any time a required specification is not met and can be anything from an issue with a service or product to a process.

A

non-conformance

53
Q

You are an at-risk construction manager on a project. The owner has its own construction management staff that are also on the project. Typically, who has the final review of the construction schedule in this scenario?

A

The owner’s construction management staff