Project Management (30) Flashcards
You are representing a regional water wholesaler on a tunnel/pipeline project under a CM-for-Fee arrangement. The owner intends to perform the project by holding separate contracts with a design firm and a contractor to be selected from a list of pre-qualified bidders. As the owner’s agent, in order to provide competent plans and specifications and avoid (or at the least) minimize the owner’s exposure to preventable claims, one should recommend to the owner that they:
Involve construction specialists as part of the project team from day 1
A contractor’s proposed schedule of values that provides for inequitably excessive payments at the beginning of the project is typically known as:
Front-end loading
The project delivery system that allows the option to fast-track a project is:
Design-Build
The goal during the design phase is to complete a set of documents defining a project that can be bid in the local marketplace within the owner’s requirements for:
Budget, scope, and schedule
A CM that has a Program Management (PM) agency contract generally acts in who’s interests?
Owner’s
In deriving a contractor’s experience modification rate (EMR), which one of the following is most important?
Frequency of past accidents
What is the most important trait of a successful Project Manager?
A strong communicator
What is an important action you can take to limit your project liability?
Make note of safety violations, notify contractor/owner in writing and ask for it to be corrected
When doing force account work, the work performed by the contractor should be verified daily by the:
CM and the contractor(s)
Which of the following are activities of the Project Pre-Design Phase?
The owner assembles and organizes a project team of design and construction management professionals
A constructibility review focuses on:
the clarity, completeness, and consistency of the construction documents
A firm provides design, design-build, and a full range of construction management services. On an Agency CM project that was completed 24 months ago, the connection detail between the curtain wall and structural frame fails on 60% of the glazing system. After assessing responsibility, the mosty likely outcome by the court will find that the:
design experience of the firm relevant in determining issues of professional negligence and financial responsibility for damages
A key discriminator of at-Risk Construction Management project delivery method is:
The at-risk CM acts as a general contractor during construction
Which of the following apply to both CM as Agent and CM at-Risk contract types?
Both require professionalism and teamwork and leadership
The definition for a review of a project’s contract documents to ascertain clarity, consistency, and completeness is called what type of review?
Constructability