PSW Flashcards
PSW Power Supplies
• P41-C001A 4160v Bus E • P41-C001B 4160v Bus G • P41-C001C 4160v Bus F • P41-C001D 4160v Bus F • P41-C002,S/B D/G SW Pmp 1R24-S026 via 4160 1F or 2F (follows D/G Bkr)
Physical Divisions
Div I - A/C
Div II - B/D
Electrical Division
Div I - A/D (S025 via 600-C)
Div II - B/C (S027 via 600-D)
RSDP Operation
• At RSDP PSW B
o Auto start on low pressure is defeated.
o Auto start after LOSP load shed is defeated.
PSW Trips
OLLDM
• Overcurrent
• LOCA Load shed (w/ EDG Auto tie to bus)
- Pmps autostart if not in-service if LOCA ONLY
• LOSP Load shed
• DC Loss of Control Power (“C” & “D” Pmps only)
• Manual
PSW TB Isolations
F316A-D (F310A-D) T/B Isol
• LOCA from EITHER CS logic
(keylock override)
• LOSP (86 Lockout)(when pwr restored)(keylock override)
• Con Bay Flooding 3” abv flr (NO OVERRIDE)
MUST HAVE POWER FOR VALVE TO PHYSICALLY ISOLATE
PSW Initiations
• Stdby pump auto start 95 psig dec.
• W/ CS in AUTO, A&B pumps restart 22s after LOCA load shed if any pwr available
• Pumps sequence ON following LOSP Load shed (see 34AB-R22-002)
• Stby D/G PSW auto starts when 1B EDG starts
(All 3 switches must be in AUTO to get Auto Start, Any 1 of 3 sw in Off will stop pmp) (U1 Div II B/U to EDG)
PSW Intake Level Limits
• 61.7 starts shiftly monitoring
• Min pump well level 61.2 else reduce flow <7000
• UHS inop <60.5’
o At 97° RHRSW and ECCS room coolers become INOP
LOCA/LOSP Timer failure
LOCA – Start pump
LOSP – Open link in Swgr room
Then start pump
PSW Pump Capacities
C001 - 8500gpm (30%/pmp) - (Min flow at 150psig)
C002 - 700gpm
Screen limits
Timer - 12 hrs auto starts
dp level of 6” - runs until cleared
Strainer limits
Based on dp - 4psid - runs for 6.5(2.5) min
PSW SCRAM Limits
- TOTAL loss of PSW
- PSW Hdr press <50psig
- TB hdr press <30psig
- Suspected leak in Turbine Bldg
TS LIMITS
1 pmp - 30 days
1 pmp/div - 7 days
1 TB Isol - 30 days
1TB isol/div - 72hrs
Mode 3-12
Mode 4 -36