Fire Protections Flashcards

1
Q

FP Auto Starts

A
AUTO starts   Hdr press drops
•	Jockey Pmp stop -- 157 psig
•	Jockey Pmp start –  125 psig
•	Mtr Drvn FP1 –      <110 psig
•	Eng Drvn FP2 –     <100 psig
•	Eng Drvn FP3 –       <90 psig
  • Deepwell Lead starts 159’ 1”
  • Deepwell Lag starts at 158’ 7”
  • All stop at 159’ 7”
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

FP Power Supplies

A
•	X43-C001, Mtr Drvn FP
                     4160v Bus 1E
•	X43-C003, Jockey FP
          1R25-S051via 1R24-S028 via 600 1A
•	#1 Deepwell Pmp   600V 2K
•	#2 Deepwell Pmp 1R11S044 1C
•	Fire pump house general
         1R25-S034 via 600 1A if 
         lost must manually start 
         diesel fire pumps
•	Protectowire, Alison, XL-3, and CXL Systems
                         Ess Cab 1A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

FP Trips

A
Mtr Fire Pump C001
•	O/L
•	Undervoltage
•	LOCA/LOSP-Ld Shed(reset)
Eng Fire Pumps C002A/B
•	Overspeed (ONLY S/D)
•	1750 RPM

ALARM ONLY
• Low Oil Press - 15# 20s TD
• High crankcase press
• Low cool water press

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Eng Pump START Failure

A

30 sec crank, then Stop for short period.
Reattempts Crank On & Off for 1-1.5 min
Cycles batteries also
Reset - Switch to OFF

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

CARDOX Systems

A
CARDOX – wintergreen
13 Ton – Cable Spread or Computer Rooms  
Man Actuation Only -Man P/B or brk glass and repo lever  (Double Shot capacity)
5 Ton – DG bldg 
AUTO by thermostat or
Semi-auto Man P/B (hall) or 
Man Valve -Hall and Mstr Byp
Has CARDOX hose reel
Capacity
(1 shot to 5 Rm or 2 to 1 Rm)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

HALON Interaction

A

Serv Bldg Recd vault-abort in printer room, 2 at exit doors
Doc Strg Bldg-
Simulator- 3 abort
Computer Bldg 1st flr- 4 abort

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Types of Fire Suppression

A
  • Deluge-oil sys & fltr trn(man), open head (Isol on Loss of Air)
  • Fixed Wtr-xfrmrs, directn heads
  • Dry Pipe-outdr sys, air press actuated, melting head
  • Wet Pipe-HPCI,RCIC,RcrcMG, E & W Cblwy, melting head
  • Preaction Sprinkler- smoke det and melting head - Cable Spreading Room, R/B HVAC,R/B Chillers
  • CARDOX
  • Halon