Power Generation Flashcards

1
Q

Two types of interfaces?

A

Power ( Voltage) and Signal ( Comms)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the purpose of PWRSS?

A

Fire Control Equipment receiving primary power.

Buffers, converts, regulates, distributes, monitors and controls supplied power

SWS[Loads] launcher, DRS, MTRE, VAMP, Swsmin, missile

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Purpose of tie breakers?

A

Connects 1-2:source together. If one removed there is still a supply to FC systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What Equipment makes up the PCME

A

PDE PBE PCE PMCE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What Equipment is in the PCME?

A

6xPMA 3xVSA 2xAMA 1xDC voltmeter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many buffers to launch missile

A

Any 2 of 3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Alarm indication on 5v?

A

Indicating push button, to observe supply and reset.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Indication of PWRSS on each door

A

Visual indicator of abnormal status, provided by
PDE PBE PCE PCME

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

270v DC ground fault

A

Resistance between leg of distribution and ground Less than 75K ohms

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

28v DC ground fault

A

Distribution and ground Less than 7K - 62K ohms

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Online monitoring, threshold impedance

A

Impedance path of less than 9K ohms to ground

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Purpose of the PPS?

A

Provide 115v 1ph 5.1Khz power to the Command sequencer and permit setting of RBA fuses

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Two methods of detecting ground faults

A

Online fault monitoring- continuous
Ground fault test SMP- periodic

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

PCM

A

Software program that executes in the DCSS
Displays at Fire Control console

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Name two missile test modes?

A

Fuse test and Tactical mode

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Purpose of a DC Convertor Function

A

Top provide a stabilise 270vdc to SWS (Fire Control )

17
Q

What range can DC- DC Convertor operate?

A

210-355V

18
Q

What is the Purpose of 35KW MG’s

A

Supply 120v 3p 400hz to ships services
Alternate is 2x 10Kw for Nav equipment

19
Q

What is the voltage range and over volt limit

A

10% range with 351 over volt limit

20
Q

What is the output of the 400hz mg

A

120V 3ph 400Hz

21
Q

Where is the 1SF switchboard located?

A

MCC passageway outside entrance to MCC

22
Q

Checks on switchboard and MG

A

Check voltmeter
Check frequency
Check MG output ammeter ( not overloaded)
Check DC ammeter ( not overloaded)
Check MG for noise, vibration and sparking
Check MG temperatures

23
Q

What is done to brushes if off for an extended period?

A

Lift brushes and place insulating NOMEX between brushes and commutator

24
Q

What is to be turned of after shutdown of MG?

A

CW water supply to stop condensation

25
Q

What speed does the over speed trip operate?

A

Contacts open automatically to secure MG at
1972 +- 20rpm

26
Q

What is the purpose of the motor controller?

A

DC magnetic controller, connects to the drive
end of MG to ships 270vdc distribution system

27
Q

Periodic checks on SB and MG

A

Check voltmeter Adjust rehostst
Check frequency meter
Check for noise, vibration and sparking
Check for air temperature