Control Quality Management is…

A

process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes. Does the delivered output meet the requirements? provide confidence that the stakeholder’s requirements will be met and quality control should be used during the project executing and closing phases to formally demonstrate, with reliable data, that the sponsor and/or customer’s acceptance criteria have been met.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Benefit of Control Quality Management is

A

(1) identifying the causes of poor process or product quality and recommending and/or taking action to eliminate them; and (2) validating that project deliverables and work meet the requirements specified by key stakeholders necessary for final acceptance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Insert ITTO 8.2

A

Insert ITTO 8.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Prevention

A

keeping errors out of the process

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Inspection

A

keeping errors out of the hands of the customer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Attribute Sampling

A

the result either conforms or does not conform

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

variables sampling

A

the result is rated on a continuous scale that measures the degree of conformity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Conformance

A

Look this up later

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Input of Control QA (WADOPPQQ):

A

WPD, Approved Change Req, Deliverables, OPA, Proj Doc, PM Plan, Qual Metrics, Qual Checklists

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Input of Control QA (WADOPPQQ):WPD

A

ex: Planned vs. actual technical performance,
Planned vs. actual schedule performance, and
Planned vs. actual cost performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Input of Control QA (WADOPPQQ):Approved Change Req

A

Perform Integrated Change Control process, a change log update indicates that some changes are approved and some are not. Approved change requests may include modifications such as defect repairs, revised work methods, and revised schedule

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Input of Control QA (WADOPPQQ): Deliverables

A

any unique and verifiable product, result, or capability that results in a validated deliverable required by the project.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Input of Control QA (WADOPPQQ):Org Process Asset

A

The organization’s quality standards and policies,
Standard work guidelines, and
Issue and defect reporting procedures and communication policies.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Input of Control QA (WADOPPQQ):Project Documents

A

Agreements,
Quality audit reports and change logs supported with corrective action plans,
Training plans and assessments of effectiveness, and
Process documentation such as those obtained using either the seven basic quality tools or the quality management and control tools shown in Figures 8-7 and 8-10.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Input of Control QA (WADOPPQQ):PM Plan

A

plan contains the quality management plan, which is used to control quality.

17
Q

Input of Control QA (WADOPPQQ):Quality Metrics

A

metric describes a project or product attribute and how it will be measured. Examples: function points, mean time between failure (MTBF), and mean time to repair (MTTR).

18
Q

Input of Control QA (WADOPPQQ):Quality Checklists

A

structured lists that help to verify that the work of the project and its deliverables fulfill a set of requirements.

19
Q

TT of Control QA: (SSIA):

A

Seven Basic Qual Tools, Statistical Sampling

20
Q

TT of Control QA: (SSIA): Seven Basic Qual Tools

A

See Chapter 8.2

21
Q

TT of Control QA: (SSIA): Statistical Sampling

A

See Chapter 8.1, Samples are selected and tested as defined in the quality management plan.

22
Q

TT of Control QA: (SSIA): Inspection

A

examination of a work product to determine if it conforms to documented standards. measurements and may be conducted at any level. Also to validate defect repairs.

23
Q

TT of Control QA: (SSIA): Approved Change Requests Review

A

All approved change requests should be reviewed to verify that they were implemented as approved.

24
Q

Output of Control QA: (QVVWCPPO):

A

Quality Control Measurements,Validated Changes,Verified Deliverables,Work Performance Information,Change Requests,PM Plan updates,Proj Doc updates,OPA updates

25
Q

Output of Control QA: (QVVWCPPO): Quality Control Measurements

A

documented results of control quality activities, captured in the format that was specified through the Plan Quality Management

26
Q

Output of Control QA: (QVVWCPPO): Validated Changes

A

inspected and will be either accepted or rejected before notification of the decision is provided

27
Q

Output of Control QA: (QVVWCPPO): Verified Deliverables

A

determine the correctness of deliverables

28
Q

Output of Control QA: (QVVWCPPO): Work Performance Information

A

information about the project requirements fulfillment such as causes for rejections, rework required, or the need for process adjustments.

29
Q

Output of Control QA: (QVVWCPPO): Change Requests

A

corrective or preventive actions or a defect repair requires a change to the project management plan

30
Q

Output of Control QA: (QVVWCPPO): PM Plan updates

A

Quality management plan , and Process improvement plan

31
Q

Output of Control QA: (QVVWCPPO): Proj Doc updates

A

Quality standards;
Agreements;
Quality audit reports and change logs supported with corrective action plans;
Training plans and assessments of effectiveness; and
Process documentation, such as information obtained using the seven basic quality tools or the quality management and control tools.

32
Q

Output of Control QA: (QVVWCPPO): OPA updates

A

Completed checklists.