When was PM KUSUM launched?
2019
PM KUSUM (2019) full form?
Kisan Urja Suraksha Evam Utham Mahabhig Yojana
Aim of PM KUSUM
Solarisation of Agriculture
* Providie water & energy security.
* Achieve 30.8GW solar power capacity by 2026.
* Reducing diesel consumption & import bill of petroleum
Farmers will be Annadata & Urjadata
According to India’s NDCs, India has committed to increase the share of installed capacity of electric power from non-fossil fuel sources to ____ by year ____?
increase to 40% by 2030
The share of non-fossil fuel sources in India’s total installed electricity generation capacity reached ____% as on Oct 2023. India is committed to achieving ____% non-fossil based installed electricity capacity by 2030.
44%
50%
PM Kusum is under ministry of? it has how many components?
MoNRE
3 components
Aim of Component A of PM KUSUM (2019)
Decentralised 10,000 MW ground stilt mounted, solar power plants
of 2 MW capacity
Aim of Component B of PM KUSUM (2019)
Installing 20L stand-alone solar pumps in agri
Allocation division of component B of PM KUSUM
- 30% allocation by centre rest 70% by beneficiary - general
- 50% by centre - NER/Himachal/Islands
Aim of Component C of PM KUSUM (2019)
Solarisation of 35 lakh Grid Connected agri pumps through:
* Individual pump solarisation
* Feeder level solarisation
Beneficiaries of Component B & C of PM KUSUM
individual farmers, Water Use Associations, PACS, Community Cluster Based irrigation system
Under PM KUSUM, farmers can install grid connected solar power plants up to ____ MW
2MW
Which component of PM KUSUM has been included in Priority Sector Lending by RBI
Component A
Competitive rates for banks and on soft terms
In PM KUSUM, MNRE in 2020 increased the scope of the scheme by including ____ lands owned by farmers.
Pasture and marshy lands
PM KUSUM completion period has been increased from 9 months to ____ ?
12 months
____ is one of the largest initiatives in the world to provide clean energy to more than 3.5 million farmers
PM KUSUM
Solar Power Plants will be preferably installed within a ____ km radius of notified sub-station to avoid high cost of transmission
5 km radius
For Component A, agreement with DISCOMS are for ____ years
25 years