PHEP 32 Flashcards

1
Q

AN ISOLATED SYSTEM IS NOT CONCERNED WITH PROBLEMS DEALING WITH

A

INTERCONNECTED SYSTEM OPERATION

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

FLAT FREQUENCY CONTROL

A

DESCRIBES A CONTROL ARRANGEMENT WHERE ONE UNIT OF A MULTI UNIT PLANT MAY BE ASSIGNED TO CONTROL FREQUENCY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A CONTROL SCHEME IN WHICH EACH SYSTEM INTERCONNECTED BY TIE LINES IS CONTROLLING FREQUENCY SIMULTANEOUSLY IS CALLED

A

TIE-LINE BIAS CONTROL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A CONTROL AREA

A

IS ONE OR MOR SYSTEMS OPERATING WITH METERING AND CONTROL FACILITIES ON ALL OF ITS TIES TO OTHER SYSTEMS OUTSIDE OF THE CONROL AREA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

THE COMBINED GOVERNOR ACTION AND INERTIA OF ALL GENERATING UNITS CONNECTED TO A SYSTEM IS USED TO ESTABLISH

A

THE FREQUENCY BIAS SETTING FOR THAT CONTROL AREA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

INCREMENTAL LOADING REFERS MAINLY TO

A

THE ECONOMICAL GENERATION OF ELECTRICAL ENERGY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

A PROCEDURE WHEREBY 2 SYSTEMS NOT DIRECTLY TIED TOGETHER EXCHANGE ELECTRICAL ENERGY WITH EACH OTHER THROUGH A THIRD SYSTEM TO WHICH THEY ARE MUTUALLY CONNECTED IS CALLED

A

WHEELING ENERGY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

AN INTERSYSTEM TIE-LINE METER SHOWS HIGH FREQUENCY AND POWER FLOW OUT. THIS WOULD BE AN INDICATION OF

A

A LOSS OF CUSTOMER LOAD OR OVER GENERATION INTERNALLY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

1 ESSENTIAL REQUIREMENT TO BE MET BEFORE 2 SYSTEMS CONSIDER INTERCONNECTING WITH EACH OTHER IS

A

THAT EACH HAVE THE CAPABILITY OF OPERATING INDEPENDENTLY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

UNIT CONTROL OF LOAD AND FREQUENCY IS PREFERRED OVER PLANT CONTROL BECAUSE

A

ALL OF THE ABOVE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly