Phase I Training Flashcards

1
Q

What two styles of apparatus do we have?

A

Apparatus with 3 cross lays

And

Apparatus with 2 cross lays

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the color of the hose on the front bumper and what is the length of the hose?

A

Blue hose
150 feet
Triple loaded

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

On apparatus with 3 cross lays, what is the configuration of the setup?

A

Cross lay #1 is 200’ 1.75” triple load with Elkhart automatic fog nozzle with a 15/16 smooth bore slug

Cross lay #2 is 200’ 1.75” triple load with Elkhart automatic fog nozzle with a 15/16 smooth bore slug

Cross lay #3 is 200’ green 2.5” minuteman load with an Elkhart 2.5” shut-off 1 3/16” smooth bore tip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Describe the psi and gpm for the 1 3/16” smooth bore tip

A

40 psi NP(pdp 68)=265gpm
50 psi NP(pdp 85)=296 gpm
60 psi NP(pdp 102)=325gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How is the 2.5” FDC hose loaded?

A

400’ of 2.5” in two stacks of 200’ flat loaded side by side

50’ minuteman shoulder load on top of each stack strapped

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How is the 2.5” horizontal standpipe loaded

A

200’ of 2.5” NOT preconnected

minuteman load (150’ flat loaded with 2 loops 50’ shoulder bundle on top)

Nozzle is a 2.5” to two 1.5” gated wye

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Rear 1.75” preconnected attack line

A

300’ 1.75” preconnected

Minuteman load (200’ flat loaded with 2 loops. 100’ shoulder bundle strapped)

Nozzle is an Elkhart automatic fog with a 15/16 smooth bore slug

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What will be added to our standpipe bag?

A
Line gauge
Elbow
Gate valve
Aluminum pipe wrench
Wire brush
Flat Ivan door chock
Allen wrench set
How well did you know this?
1
Not at all
2
3
4
5
Perfectly