passage planning Flashcards
1
Q
Hand over of the watch
A
The hand over should take place with adequate time before hour
2
Q
Passage plan references
A
- MGN 166
- Bridge procedures guide
- STCW chapter 8
- Safety of navigation anex 24 - voyage planning
- Safety of navigation annex 25 - guidelines for voyage planning
3
Q
what is a passage plan
A
Passage plans are birth to birth and must be approved by the master
4
Q
What does APEM stand for
A
Apprasial
Planning
Execution
Monitoring
5
Q
give 10 items that you would consider in the voyage plan stage with ECDIS being your primary means of navigation’?
A
- All chart licences have been renewed
- All chart updates have been completed
- The ECDIS system is up to date
- Confirmation of the ECDIS safety settings to be used
- Safety Contour, Safety Depth
- Cross track error and safety frame values
- Information layer to be used symbol types to be used
- Use of the 1:1 button to eliminate SCAMIN
- All contingency plans to be planed and checked and saved as separate routes (if you have to divert to a port of refuge for example)