OSHA Flashcards
: A contractor agrees with a subcontractor to divide job site responsibilities, such as providing safety programs, temporary sanitation facilities, etc. Is this legal?
This is legal, however, the contractor cannot be relieved of overall responsibility.
Who is responsible for providing safety training for employees?
The employer
Who is responsible for providing first aid services and provisions for medical care for employees?
The employer
Containers used for storing flammable waste shall be equipped with:
Covers
The common drinking cup is:
Always prohibited
What is the minimum number of urinals and toilet seats for 200 employees?
4
An employee is exposed to a noise decibel level of: 110 db for ¼ hour, 100 db for ½ hours and 90 db for 1 ½ hours. The equivalent noise exposure:
Does not exceed unity, the exposure is within permissible limits
Exposure to impulsive or impact noise should not exceed how many decibels peak sound pressure level?
140 decibels
The minimum illumination in active general construction storage areas is:
3 foot-candles
The contractor has which responsibility in relation to hard hats?
He must require their use and supply them
Eye protection near dangerous working conditions:
Is required at the employer’s cost
A safety belt lanyard shall be a minimum of ½ inch nylon and a maximum length to provide for a fall of:
No greater than 6 feet
Safety belt lanyards shall be:
A minimum of ½” nylon
Safety nets shall extend how far beyond the edge of the work surface.
8’ Feet
Which extinguisher will extinguish a Class B fire?
Foam, carbon dioxide, dry chemical
What type of extinguisher will not extinguish a Class A fire?
Sodium
No more than how many gallons of flammable liquids shall be stored in a room outside of an approved storage cabinet?
25 gallons
Room heaters are considered to be temporary heating devices, and as such, they should have a minimum side clearance, rear clearance, and chimney clearances of many inches?
12” side, 12” rear and 18” chimney clearance
Temporary heaters shall be located a minimum of how many feet from combustible tarpaulins?
10 Feet
Material stored inside buildings under construction shall not be placed within how many feet of an exterior wall.
10 Feet
Loose brick stacks shall not be more than how many feet in height?
7’ Feet
When masonry blocks are stacked higher than how many feet, the stack shall be tapered back one-half block per tier above the top level?
6’ Feet
What should be done with used lumber before it is stacked?
Remove nails
Lumber piles shall not exceed how many feet in height when handled manually?
16’ Feet