OM B Chapter 2 Normal Procedures Flashcards
On what runway condition is a takeoff not permitted ?
- Wet ice
- Water on top of compacted snow
- Dry snow or wet snow over ice
Can a takeoff be started with a RWYCC of 0 ?
No, no takeoff or landing allowed
What is the minimum runway width to be cleared/treated ?
30m, a runway wider than 45m can be cleared to a width of less than 45m from the centerline. It should not be considered as narrow runway.
When is one eng taxi out prohibited ?
- Taxiway slippery
- LVP at dep aerodrome
- pushback completed with a powerpush on the main landing gear
What technical defect prevent you from doing a single engine taxi ?
Hydraulic: no yellow electrical pump
electrical : gen 1 failed, Apu gen must be serviceable for aircraft without the SETWA
Pneumatic/air conditioning : Air pack 1
issue with steering or breaking
What are the first officer limit ?
Max crosswind including gust : 20kts
minimum RVR 400m
Approach minimum : CAT I ils, Minima of NPA, 5000m vis for circling
No contaminated rwy or slippery
no reported windshear
What is the minimum battery voltage when powering the A/C ? Can a APU fire test be done when below it ?
Minimum 25.5V
No, risk of APU extinguisher discharge
WARNING:
DO NOT PERFORM APU FIRE TEST IF BATTERY VOLTAGE IS AT OR BELOW 25.5 V AS THIS MAY RESULT IN THE DISCHARGE OF THE APU FIRE EXTINGUISHER BOTTLE. OMB 2.3.4.2
What is the maximum time you should hold the APU fire test PB ?
No more than 3 sec, otherwise it might auto shutdown and discharge APU fire bottle
WARNING:
THE AUTOMATIC SHUTDOWN OF THE APU AND THE DISCHARGE OF THE APU FIRE EXTINGUISHER BOTTLE MAY OCCUR IF THE FLIGHT CREW PRESSES THE APU FIRE TEST PB FOR MORE THAN 3 SECONDS. OMB 2.3.4.3
When should a complete IRS alignment be done ?
- Before the first flight of the day, or
- When there is a crew change, or
- When the GPS is not available and the NAVAIDS coverage is poor on the expected route, or
- When the GPS is not available and the expected flight time is more than 3 h.
OMB 2.3.4.5
When should you do a fast alignment ?
A fast IRS alignment must be performed if a complete IRS alignment is not necessary and the difference between the IRS position and the FMGC position is at or above 5 NM
What is the minimum oil quantity ?
- (CEO): Check that the oil quantity is at or above 9.5 qt + estimated consumption (average estimated consumption ~ 0.5 qt/h).
- (NEO): Check that the minimum oil quantity is the highest value of:
10. 6 qt, or
8. 9 qt + estimated consumption (average estimated consumption ~ 0.45 qt/h)
Note 1:(NEO) If the engines have been shut down for more than 60 min, decrease the above quantities by 3 qt to take into account the oil thermal expansion.
OMB 2.3.4.8
When should you set the pack flow to LO ?
A319/A320 : Less than 130pax
A321 : Less than 160pax
OMB 2.3.6.2
When is the navaid deselection not necessary ?
If GPS is primary even if NAVAID not working in the notam
What is the auto flaps retraction ?
Can be needed if green dot is higher than the speed constraint.
The flaps will auto retract at 210kts and leave only the slats to enable a speed of 220kts to be flown
What is the maximum altimeter difference on the ground ?
+-20ft between PFD
+- 100ft between ISIS and PFD
Altimeters and airport elevation +-75ft
Following the refuelling what is an abnormal discrepancy ?
Up to 6tons = 400kg
Between 6 and 12t = 500kg
more than 12 = 600kg
what should be done if, during the engine start, the ground crew reports a fuel leak from the engine drain mast ?
Run engine at idle for 5 min, if the leak disappears after 5min you can dispatch otherwise maintenance need to be called
OM B 2.3.8.1
When do you need to have the engine anti ice on for take off ?
When OAT is at or below 10°C and visible moisture (clouds, fog with vis less than 1600m, rain snow, sleet and ice crystals) and/or ground surface has snow, standing water or slush.
What is the ice shedding procedure for CEO ?
When in icing conditions and OAT +3° or less for more than 30min or significant vibration then:
- set park brake or stand on the brakes
- accelerate to 70% N1 for 30sec at an interval no greater than 30mins
What is the ice shedding procedure for NEO ?
When in icing conditions and OAT +3° or less for more than 30min or significant vibration then:
- set park brake or stand on the brakes
- accelerate to 50% N1 for 5sec at an interval no greater than 60mins
If the takeoff is not initiated within 120min in ground icing condition, the maintenance will need to perform an engine inspection.
Can you use wing anti-ice on the ground ?
No, the wing anti-ice will open for 30s on the ground then closed as long as the aircraft is on the ground.
When do you need the IGN for takeoff ?
When the runway has
- standing water
- Heavy rain is falling
- heavy rain or severe turbulence is expected after takeoff
What correction do you need to apply to the Flex temp in case of drop in QNH ? Use of ENG Anti ice ?
QNH reduction of 1 or 2 hPa = -1°c
ENG anti ice = -5°c
Following a change in QNH or the use of ENG anti ice for takeoff, what do you need to check for the new Flex temp ?
If the OAT or TREF is reach by applying the reduction in Flex temp then a new takeoff perf need to be computed.
What are the TREF(flat temperature, lowest temp you can use as flex for takeoff.) for A319, A320, A321 ?
A319 = ISA +30°C A320 = ISA +29°C A321= ISA +15°C