OBSTACLES Flashcards
Who is responsible for conducting a recon and declare obstacles on and near the DZ?
DZSTL
What are obstacles a personnel may face?
Any features, Natural or Man-Made that pose a hard to the jumper or prevent the jumper from accomplishing his or her mission.
Obstacles to equipment
Any features, Natural or Man-Made that hinder the recovery of the load or cause damage to a load
What are the Three Primary Obstacles?
- Trees
- Water
- Power Lines
What is the requirement for a tree obstacle?
35 feet or higher impeding recovery of personnel or equipment
What is the requirement for a water obstacle?
4 feet deep or deeper AND 40 feet wide at the widest point, within 1000 meters of the edge of DZ. The DZSTL can declare any body of water a water obstacle.
What is the requirement for a Power Line obstacle?
50 volts or greater. Within 1000 meters of the DZ boundary (Coordinate with Power Company to shut off power NLT 15 min. prior to TOT)