Mooring Procedures Flashcards

1
Q

Mooring alongside a pier and getting underway from a pier are basic yet extremely critical functions performed by…

A

the deck department

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Personnel involved in the mooring of a ship and getting underway are: (4)

A

Safety officer, line POIC, phone talker, Line handlers.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Safety Officer

A

Responsible for the safe execution of the mooring evolution

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Line POIC

A

Responsible for ordering commands to line handlers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Phone Talker

A

Responsible for relaying all communications from the Bridge and Line POIC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Line handlers

A

Responsible for tending the ships mooring lines and executing orders from the POIC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When preparing to moor the ship to a pier, lines are broken out and ___ ___ near the chock it will be passed through.

A

faked down

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The eye will be passed through the chock and over the…

A

life rails

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The ___ will be made ready to let go in case in case of an emergency.

A

anchor(s)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

(mooring) Once alongside the pier the order ___ ___ is given

A

single up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Heaving lines will be passed over, first yelling ___ ___.

A

heads up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

(mooring) Line handlers will ___ ___ until the eye of the line is placed over the Bollard on the pier.

A

Slack off

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

(mooring) After the eye is placed over the Bollard. Line Handlers will “Heave Around” until the line is …

A

tensioned

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

After “Heave around” (line tensioned)

A

The Line Stopper will be “Passed.”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

At the order “Up Behind” line handlers will

A

make four figure 8’s on the Bitts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

(during mooring procedures) After “Up Behind”

A

release the stopper

17
Q

When all lines are double up and birds nested, the …

A

frapping lines and rat guards are prepared to put on.

18
Q

Prior to getting underway: (5)

A

Conduct Safety Brief, Undo the “Birds Nest” and fake down the line, Remove the Rat Guard, Remove the “Frapping” lines, Report, “Manned and Ready” to the Bridge.

19
Q

(underway procedure) At the first order: ___ ___ line handlers will remove figure 8’s and slack the line.

A

Single Up

20
Q

(underway procedure) The eye of the Double Up will be cast off and line handlers will Heave Around until the line is…

A

“On Deck”

21
Q

Fake down the line to reduce…

A

trip hazard

22
Q

At the next order: ___ ___ ___ ___ line handlers will remove figure 8’s and slack the line. (preparing underway)

A

Take in all Lines

23
Q

After “Take in all Lines.” The eye will be cast off and line handlers will Heave Around until the line is…

A

“On Deck.”

24
Q

Safety in mooring evolutions (5):

A
  • Tend lines well behind the bitts in case of parting
  • Do not stand in the direct line of pull of a working line.
  • Do not stand in the bight of a line.
  • Maintain positive control of the line, handle “hand over hand.”
  • Remove all rings, watches, chains, loose clothes and gear.
    Ensure that all hands involved attend a safety brief before the evolution.