Mooring Procedures Flashcards
Mooring alongside a pier and getting underway from a pier are basic yet extremely critical functions performed by…
the deck department
Personnel involved in the mooring of a ship and getting underway are: (4)
Safety officer, line POIC, phone talker, Line handlers.
Safety Officer
Responsible for the safe execution of the mooring evolution
Line POIC
Responsible for ordering commands to line handlers
Phone Talker
Responsible for relaying all communications from the Bridge and Line POIC
Line handlers
Responsible for tending the ships mooring lines and executing orders from the POIC
When preparing to moor the ship to a pier, lines are broken out and ___ ___ near the chock it will be passed through.
faked down
The eye will be passed through the chock and over the…
life rails
The ___ will be made ready to let go in case in case of an emergency.
anchor(s)
(mooring) Once alongside the pier the order ___ ___ is given
single up
Heaving lines will be passed over, first yelling ___ ___.
heads up
(mooring) Line handlers will ___ ___ until the eye of the line is placed over the Bollard on the pier.
Slack off
(mooring) After the eye is placed over the Bollard. Line Handlers will “Heave Around” until the line is …
tensioned
After “Heave around” (line tensioned)
The Line Stopper will be “Passed.”
At the order “Up Behind” line handlers will
make four figure 8’s on the Bitts