Q

The company directing the crane (client) has many responsibilities.
Name 5

A

Access roads are adequate

Operating locations are firm and level

Operating locations away from trenches

Blocking is available

Operating locations are away from power lines

Sufficient room for crane erection

The maximum radius,loads and heights are known

Adequate swing clearance

Ropes/barricades in place

Access to site restricted

Competent person involved in rigging

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When should lift forms be done

A

Over 75 % of capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What do you need to be aware of on an elevation view drawing

A

The info displayed

The crane clearance

Head and rigging clearance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is shown in the rigging view

A

Everything from the block down to the lifting points

Rigging is thoroughly detailed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the perspective view good for

A

If you have to place a load into something

Shows overall 3D view of lift

Good look at area as a whole

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What’s shown in the plan view (birds eye)

A

Starting to final positions of crane

Distances for obstructions

Radius and tail swing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does the lift information on a drawing include

A

All configuration info

Load weight. Capacity, deductions

% of capacity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly