What are the advantages of lattice boom cranes ?

A

Being able to pick heavier loads and have much greater reach both in distance and height

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The heel or butt is what section of the boom

A

The bottom section it connects to the superstructure of the crane and allows the transition to the boom sections to be made.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The boom tip is another essential part of the boom. It holds what ?

A

The boom head which has all the sheaves amongst other components

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What do boom inserts provide

A

A method of lengthening the boom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the 3 main types of boom tips (lattice boom)

A

Open throat
Hammerhead
Tapered tip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the advantage of an open threat

A

The block may be retracted into the boom at higher boom angles providing the load more height and making close up lifts possible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is your standard boom tip (lattice)

A

A tapered tip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When would you use a hammerhead tip?

A

On heavy lifts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The main chords of the lattice boom are the four components that run the length of the boom. What do they provide ?

A

They provide strength

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What allows the boom sections to be easily interchanged ?

A

The pin connection lugs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What gives the main chords their strength ?

A

The lacing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What provides the effort and mechanical advantage for the crane to boom up and down (lattice)

A

The boom hoist reeving

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What provides the boom the ability to boom up tight without worrying about collapse of the boom

A

The boom stops

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The boom hoist kick out provides what ?

A

A method either mechanically or electronically of stopping the boom.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The _____ provides a mounting point for the inner bail.

A

Gantry

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The inner and outer bails provide what ?

A

A mechanical advantage by holding sheaves for the boom hoist winch to lift the boom.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What does the live mast do.

A

Holds the outer bails

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What do the pendants connect ?

A

The outer bail and the boom tip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A boom pendant spreader bar is sometimes needed for long lattice booms. What does it do

A

This helps control torsional forces on the boom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What would you use to help prevent sag on long lattice booms

A

Mid point suspension from the pendants

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Combined with the block what provides the boom with a method of achieving mechanical advantage

A

The boom head sheaves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What does the upper boom head sheave provide ?

A

A method for the hoist line to run over the top of the boom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

The super structures frame consists of high quality steel. In many cases it is combined with the frame for what 5 things.

A
Draw works 
Support for the boom 
Support for the mast 
Support for the gantry 
Support for the counterweights
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Rollers or bearings allow crawler cranes to maintain a lower degree of friction during skewing operations. What are the two types of rollers ?

A

Combination house and hook rollers

Dual function rollers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
On roller bearing type cranes where would the bearings be incased ?
Between the upper and lower sections
26
What keeps the upper works centred on the roller path ?
King pin
27
What provides the boom a secure and firm method of connecting to the upperworks
The boom foot pins and lugs
28
What do the counterweights provide ?
Stability
29
What provides a base for the upper works to revolve on (crawler)
Car body
30
The swing gear is fastened to the car body being engaged to the _____ it provides the upper a method of work
Swing pinion
31
What are the two things the track frames provide
A means of support to distribute the bearing weights | A means of moving the crane
32
What does the idler roller do ?
Acts as a guide for the proper functionality of the track assembly as well as a means of adjusting tension on the track
33
What transfers the weight of the crane and load to the track pads ?
The track rollers
34
What is mounted onto the end of the drive shaft and moves the drive chain
The inner drive sprocket
35
The drive chain engages what
The outer drive sprocket
36
The outer drive sprocket attaches to the ______ via a shaft
Drive tumbler
37
What has replaced most chain driven systems ?
Hydrostatic drives
38
What are the advantages of a hydrostatic drive
Reduces moving parts | Increase efficiency
39
What is the most dangerous part of running a lattice boom crane
Assembling the lattice
40
What must be used for "on outrigger" charts to apply ?
All outriggers
41
I'd you have all outriggers engaged but a tire is touching the ground can you use your outrigger charts
No
42
The outrigger cylinder must be connected and pinned to what ?
The outrigger float
43
What would you use to distribute the load weight on an outrigger
Blocking
44
What are three stipulations of blocking to be used under floats
Fairly rigid Tightly spaced At least 3 times larger in area than the float
45
Can your blocking be slightly un level
No. The collar could fail or the cylinder could be damaged/fail
46
If on soft ground can you block under the outrigger beams
No
47
What is the formula to find out how pressure is coming from one outrigger
P=F/A Pressure = Force/Area
48
Can you use the hoist line to level your crane
Yes but you will need to check at least over the rear and over the side
49
Can you use a carpenters level to level the crane
Yes as long as it is on a machined area on the upperworks
50
When installs a jib it must be prevented from swinging uncontrollably. What would you use
A tag line
51
How do you know which way your lacing on lattice sections will run
In the same pattern from top to bottom
52
Can you use any audio or hand signal you want ?
Yes only if it discussed and agreed upon by everyone involved with the lift before hand
53
Who needs to contact and identify each other on the radio directly before a lift
The operator and signaller
54
All directions shall be given to he operator from what perspective
The operators perspective
55
Each series of voice signals shall contain three elements. List them in order
Function, direction Distance and or speed Function stop
56
What are the five components of the PAT LMI DS160 system?
``` A2B switches Pressure transducers Cable reel Console Central unit ```
57
List the simple steps to starting the PAT LMI DS160 unit
Self test Last selected configuration will be displayed You may press ok and go right to work if set correctly Select configurations Go to work
58
List the five steps to programming the PAT LMI DS160 system
``` Set the operating mode (crane configuration) Select the outrigger configuration Verify the crane is level Select the hoist in use (if needed) Select the reeving ```
59
List the error codes from E01-E05 on a PAT LMI DS160 system
E01 boom is at to high an angle E02 boom is at too low an angle E03 boom position is out of permissible working area (over front) E04 wrong operating code or boom in prohibited zone E05 boom length in prohibited zone
60
What are the 5 components of a PAT LMI iFLEX 5 system
``` C.P.U Console Pressure transducer Length/angle sensor Anti two block switches ```
61
What are the simple steps for start up on the PAT LMI iFLEX5 system
``` Self test 2 hour window, re enter configuration or accept current Select configurations Select reeving Acknowledge or cancel Go to work ```
62
List the 6 step programming procedure for the PAT LMI iFLEX5 system
``` Set the boom configuration Set the counterweight configuration Set the hoist configuration Set the outrigger configuration Set the reeving Confirm the settings ```
63
List error codes E01-E05 as well as E18 and E83 for the PAT LMI iFLEX5 system
E01 boom is at too high an angle E02 boom is at too low an angle E03 boom position is out of permissible work area E04 wrong operating code E05 boom telescoping is compromised E18 front (where applicable) outrigger is overloaded E83 during dead section use, centre-mid boom is not in the proper position
64
What is the 8step procedure for setting up a liccon crane
``` Choose operating location Extend outrigger beams Lower suspension and lock it Level crane with jacks Shut the carrier down turn knob to superstructure Start crane from upper Configure crane Configure liccon system ```