Midrange Storage Solution Design: Midrange Storage Solution Sales Engagement Flashcards

1
Q

What are the Presales portions of the Project Management Cycle?

A

customer engagement
environment and data capture
Sizing and proposal
analysis of assessment results and site remediation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the Presales portions of the Project Management Cycle?

A

analysis of assessment results and site remediation
detailed design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the Services portions of the Project Management Cycle?

A

Implementation
Data migration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the customer engagement phase?

A

the origin of the solution design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is done during the customer environment and data assessment phase?

A

pre-site survey of the environment
list of information around business objectives of all parties

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the 3 types of information that are captured during the customer engagement phase?

A

configuration (physical systems, OS, processors, etc.)
workloads (storage access, utilization, etc.)
data (amount stored, age, etc.)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is done during the assessment analysis and site remediation phase?

A

captured logs and configuration files processed by tools that translate cryptic files

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is done during the solution sizing and customer proposal phase?

A

information fed to sizing tool - to size and quote

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What happens in the architect detailed design phase?

A

architect uses information gathered by presales to produce detailed configuration guidelines - validates w/ existing environment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What happens during the professional services phase?

A

final phase of sales engagement will insure implementation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the AE role?

A

orchestrate project events and required resources

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the Project Manager (PM) role?

A

manage the project life cycle by ensuring the achievement of milestone dates

contacts resource management to define technical needs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the Pre-Sales Architect (PSA) role?

A

work with a product specialist to provide technical knowledge, gather customer information, and validate technical requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is a Solutions Architect (SA) role?

A

Perform the consultative role during presales phase, create solution design, plan detailed configuration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is a Implementation Specialist (IS) role?

A

configure storage system in production and migrate the existing customer data

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Based on an RFP from a customer and subsequent data collection about the customer site, a storage solution was designed and implemented. But its components had some compatibility issues at the site. What could have been done to avoid this problem?

A

Check if the solution is appropriate for the customer environment in E-Lab Navigator.