Mid Term Flashcards
what is needed to be considered when it comes to well planing?
1) HSE
2) Well Integrity
3) Time = money
Who raises the need to drill a well?
Geologist
Name 4 consideration when preparing the directional plan
1) Torque and drag
2) Boundaries
3) Dog leg severity
4) Anticollison
5) Formation
Name considerations for well planing?
1) AFE
2) Apply for licence
3) Drilling bit
4) Casing
5) Name of Drilling Company
It is legal to drill 15 m beyond the termination formation to accomodate logging tools w/out mineral rights for the deeper formation: T or F
True
List 5 parts/ sections of a drilling program
1) Mud Properties
2) Drilling operation (WOB, ROP, etc)
3) Casing (set depth, size)
4) Time and procedure (schedule)
5) Location, Name, Name of company
Name 3 advantages of top drive
1) Takes less time than kelly (One stand 3 joints)
2) Safer than kelly
3) Backreaming
Responsibilities of a safety officer: (10)
1) Provide necessary safety equipment such as safety boots, helmet, safety
glasses, etc. to visitors
2) Brief a visitors
3) Ensure safery briefing to the cruew before starting the tour
4) Check equipments and alarms
5) Attend all drills and monitor response of crew
6) Check the conditions of lifting equipments and anchors
7) Prepare a job safery analysis (JSA) before job starts
8) Ensure rig site is clean and tidy
9) Test fire pumps and hoses daily
10) Report near misses
List 5 pieces of safety equipment on a rig and their function:
Equipment Purpose
1) Personal H2S detectors -to detect h2s gas in a certain zone
2) Fire extinguisher - to escape the fire
3) Smoke detectors - to detect smoke
4) First aid kid - to help a person who have injury
5) Geronimo - evacuation line for derrickhand
What are 3 examples of the legal impact to an operating company in the event of a blowout and oil spill?
1) their license can be cancelled
2) they will pay compensation to people, who suffer from that
3) Inspection and document, HSE control from goverment will take place. May go to jail
Put in order positions: (they are 6)
1) Toolpusher
2) Driller
3) Derrickhand
4) Motorman
5) Roughneck
6) LeaseHand
What are the 3 highest priorities( in order) when planning a well?
1) HSE
2) Well integrity
3) Time = money
What are 3 responsiblities of the drilling engineer?
1) Prepare drilling program
2) Designs the well
3) Improves performance
List 4 types of training personnel on drilling righs should have:
1) H2S training
2) Fire drills
3) First aid training
4) Evacuation drills
What 2 items can be found in an emergency responsible plan(ERP) ?
1) Steps what actions to take
2) Telephone numbers (Firefighter, ambulance etc)