what is needed to be considered when it comes to well planing?

A

1) HSE
2) Well Integrity
3) Time = money

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Who raises the need to drill a well?

A

Geologist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Name 4 consideration when preparing the directional plan

A

1) Torque and drag
2) Boundaries
3) Dog leg severity
4) Anticollison
5) Formation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Name considerations for well planing?

A

1) AFE
2) Apply for licence
3) Drilling bit
4) Casing
5) Name of Drilling Company

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

It is legal to drill 15 m beyond the termination formation to accomodate logging tools w/out mineral rights for the deeper formation: T or F

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

List 5 parts/ sections of a drilling program

A

1) Mud Properties
2) Drilling operation (WOB, ROP, etc)
3) Casing (set depth, size)
4) Time and procedure (schedule)
5) Location, Name, Name of company

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Name 3 advantages of top drive

A

1) Takes less time than kelly (One stand 3 joints)
2) Safer than kelly
3) Backreaming

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Responsibilities of a safety officer: (10)

A

1) Provide necessary safety equipment such as safety boots, helmet, safety
glasses, etc. to visitors
2) Brief a visitors
3) Ensure safery briefing to the cruew before starting the tour
4) Check equipments and alarms
5) Attend all drills and monitor response of crew
6) Check the conditions of lifting equipments and anchors
7) Prepare a job safery analysis (JSA) before job starts
8) Ensure rig site is clean and tidy
9) Test fire pumps and hoses daily
10) Report near misses

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

List 5 pieces of safety equipment on a rig and their function:

A

Equipment Purpose

1) Personal H2S detectors -to detect h2s gas in a certain zone
2) Fire extinguisher - to escape the fire
3) Smoke detectors - to detect smoke
4) First aid kid - to help a person who have injury
5) Geronimo - evacuation line for derrickhand

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are 3 examples of the legal impact to an operating company in the event of a blowout and oil spill?

A

1) their license can be cancelled
2) they will pay compensation to people, who suffer from that
3) Inspection and document, HSE control from goverment will take place. May go to jail

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Put in order positions: (they are 6)

A

1) Toolpusher
2) Driller
3) Derrickhand
4) Motorman
5) Roughneck
6) LeaseHand

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the 3 highest priorities( in order) when planning a well?

A

1) HSE
2) Well integrity
3) Time = money

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are 3 responsiblities of the drilling engineer?

A

1) Prepare drilling program
2) Designs the well
3) Improves performance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

List 4 types of training personnel on drilling righs should have:

A

1) H2S training
2) Fire drills
3) First aid training
4) Evacuation drills

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What 2 items can be found in an emergency responsible plan(ERP) ?

A

1) Steps what actions to take

2) Telephone numbers (Firefighter, ambulance etc)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

BOP when PIPE -> TOP and blind -> bottom?

A

Advantages:
PI - we able to circulate and kill the well
PO - we can change all above blind rams
Disadvantages:
PI - cannot replace equipment below pipe rams
PO - cannot circulate

17
Q

BOP when PIPE -> BOTTOM and blind -> top?

A
Advantages:
PI - can change all equipment above pipe ram
PO - pump and fluid up down (circulate)
Disadvantages:
PI - not able to circulate
PO - not able to change and maintain
18
Q

Define Hard shut in and advantages

A

1) HCR is closed

2) BOP is closed

19
Q

Adv and disadvantages of HARD shut in

A

Adv: minimize influx (kick size)
Disadva: water hammer effect

20
Q

Define Soft Shut In

A

1) Choke valve is open
2) BOP is closed
3) then slowly close choke valve

21
Q

Adv and disadvantages of SOFT shut in

A

Adv: control to not exced macp
less pressure pulse
Disadv: let the bigger kick volume

22
Q

HCR stands for

A

High Closing Ratio

23
Q

When doing site survey name 2 considerations:

A

1) location

2) environment

24
Q

Name 2 consideration when preparing the directional plan?

A

Torque and drag

Casing set depth ???

25
Q

List 2 requirements an operator needs to submit in a well license application:

A

1) Technical considerations

2) Environmental considerations

26
Q

List 5 parts/ sections of a driling program:

A

1) BHA (drill string, bits etc)
2) Casing details
3) Cement details
4) Mud properties
5) General information

27
Q

2 reasons why drilling contractor is better

A

1) Experienced employee

2) For OPCO it is temporary work so there is no need to hire employee, buy equipment.

28
Q

Describe how an incompent surface soil may cause safery concerns for a rig operation:

A

Incompent formation may cause of wash out and BOP and surface equipment can sink, even drilling rig can

29
Q

Name 3 examples where computer software can help optimize well design:

A

1) For drilling report (Open Wells)
2) Selecting of casing depth (Casing Seat)
3) For BHA analysis, torque and drag studies , surge and swab press. calculation, well control and stuck pipe analysis, and critical rotary speed calc( Well Plan)