Metro Tunnel Box Flashcards
1st Due Eng
RECON |Enter Entry Control Point Recon, knox, kiosk for info, locate incident, size-up, hydrant pressure on standpipe [Metro bag, racks & gated wye, UDC]
2nd Due Eng
RECON |Enter Entry Control Point, backup 1st Engine, assist w/ attack, triage, treatment & Evac WD meet WS Officer supply asgn. Tunnel standpipe [UDC, Metro bag, hydraram, bar, racks & gated wye]
3rd Due Eng
ACCOUNTABILITY/CMD |OIC & FF UDC acct. board-main ent serve as accountability officer] WD meet WS Officer supply asgn. Tunnel standpipe 1FF assist Recon Branch at kiosk or other forward location
4th Due Eng
WATER SUPPLY/ KIOSK |Meet all Wagon Drivers, select and assign tunnel standpipes, Supply assigned tunnel, 2FF assist recon branch director at kiosk or other forward location
1st Due Truck
RECON |Park 1 Blk away, join recon group, lights, test 3rd rail, WSAD, chock wheels, Discharge FCDS, FE, Vent [UDC, WSAD, TI, lights, Metro Bag, Hook, FE, EMS]
2nd Due Truck
STAGING |Stage 1 Blk away from Main Station Entrance & await orders [UDC, and tools for assigned tasks]
Secondary Station 1st Eng
RECON |Enter Entry Control Point Recon, knox, kiosk for info, locate incident, size-up, hydrant pressure on standpipe [Metro bag, racks & gated wye, UDC]
Secondary Station 2nd Eng
ACCOUNTABILITY/CONTROL |Park 1/2 Blk from Entry Control Point at Secondary Station, Accountability, Sizeup and Communications, Gather UDCs from 1st Eng/Trk [Metro Bag, Metro Worksheet, UDCs]