High Rise Flashcards

1
Q

Ways to initiate fire attack

A

Stretch pre-connect
Standpipe racks
2 1/2 with at least 1 1/8 tip
Combination pre-connect and racks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

1st Eng Responsibilities on High Rise

A
Charge standpipe and sprinkler side "A"
Annunciator panel and report findings
Knox Box
Interior size-up conditions (lobby, stairwells, fire floor, at door and inside fire apt)
designate attack stairwell
Check hallway of lower floor for layout
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

2nd Eng Responsibilities

A

Any of the 4 hose deployments
Check basement, request assignment from command:
(back up 1st eng, Floor above, adjacent Units)
Charge standpipe and sprinkler side ā€œCā€

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3rd Eng Responsibilities

A

Assist 1st due with stretch
Back-up line
Consider 2 1/2
If assisting with 1st Eng IC will designate additional Eng for back-up line
Monitor SCBA
May be assigned floor above, exposures or other priorities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

4th Eng Responsibilities

A

Floor above unless otherwise directed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

1st Due Truck Responsibilities

A
Fire floor
Aerial for Rescues
Ladder placement to fire floor, then floor above, top and roof
Force Entry
Coordinate Ventilation
Identify Stairwell for roof access and vent
Identify Evac Stairwell
Search **(stairwlls from fire floor up)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

2nd Due Truck Responsibilities

A

Side C, ladder, size-up if first on side C or update,
Floor above fire
Ladder for rescue
Coordinate with 1st Due truck to assist with stairwells, search, vent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly