High Rise Flashcards
Ways to initiate fire attack
Stretch pre-connect
Standpipe racks
2 1/2 with at least 1 1/8 tip
Combination pre-connect and racks
1st Eng Responsibilities on High Rise
Charge standpipe and sprinkler side "A" Annunciator panel and report findings Knox Box Interior size-up conditions (lobby, stairwells, fire floor, at door and inside fire apt) designate attack stairwell Check hallway of lower floor for layout
2nd Eng Responsibilities
Any of the 4 hose deployments
Check basement, request assignment from command:
(back up 1st eng, Floor above, adjacent Units)
Charge standpipe and sprinkler side āCā
3rd Eng Responsibilities
Assist 1st due with stretch
Back-up line
Consider 2 1/2
If assisting with 1st Eng IC will designate additional Eng for back-up line
Monitor SCBA
May be assigned floor above, exposures or other priorities
4th Eng Responsibilities
Floor above unless otherwise directed
1st Due Truck Responsibilities
Fire floor Aerial for Rescues Ladder placement to fire floor, then floor above, top and roof Force Entry Coordinate Ventilation Identify Stairwell for roof access and vent Identify Evac Stairwell Search **(stairwlls from fire floor up)
2nd Due Truck Responsibilities
Side C, ladder, size-up if first on side C or update,
Floor above fire
Ladder for rescue
Coordinate with 1st Due truck to assist with stairwells, search, vent