Measurement Flashcards
What is the GEA
Gross External Area - Gross External Area is the area of a building measured externally at each floor level.
Includes; All perimiter walls and projections, Areas occupied by internal walls, columns, peirs, chimney breasts, stairwells e.c.t
Excludes; open balaconies, open fire escapes, open sided walkways, open vehical parking e.c.t
What is GIA
GIA is the total area of buildings owned, occupied or maintained by the HEP, measured to the internal face of the perimeter walls at each floor level;
Includes; anything projecting inward from the internal walls including Areas occupied by internal walls, columns e.c.t
Excludes; External walls, open balaconies, open fire escapes, open sided walkways e.c.t
What is NIA
Net internal area is measures all usable floor areas;
Includes; Kitchens, Any built in cupboards or units that occupy usable areas, Perimeter skirting boards, mouldings and trunking, Open circulation areas such as atria e.c.t
Excludes; Internal structural walls. Enclosed areas of walls, Piers, columns, chimney breasts, ducts and other projections e.c.t
When is GEA used
Used when; Town planning, Rating and council tax for houses and bungalows
When is GIA used
Used when; Estate agency and valuation, Rating, Property management of industrial buildings (including ancillary offices), warehouses, department stores, variety stores and food superstores, New homes valuation
When is NIA used
Used when; Estate agency and valuation, Rating, Property management of shops, supermarkets, offices and buisness use.
What are the international property measurment standards (IPMS)
IPMS were introduced to address current inconsistencies in the way property of all types is measured from one market to the next.
What organisations use IMPS
As of 2017 there were 80 professional and non profit orginasiations who work to the IPMS including; British Property Federation, Australian Property Institute, European Council of Real Estate Professions
What is a theodolite
A theodolite is a surveying instrument with a rotating telescope for measuring horizontal and vertical angles..
What does a theodolite measure
Theodolites measure angles in degrees minutes and seconds. Each degree is split up into 60 parts, each part being 1/60 of a degree. These parts are called minutes. Each minute is split up into 60 parts, each part being 1/60 of a minute. These parts are called seconds.
How do you measure the height of a building with a theodolite
Measuring the height of a building;
- Set up the total station or theodolite ensuring that it is level
- Measure the height of the total station or theodolite with a staff looking directly forward.
- Aim the sight at the top corner of the building and record the angle
- Record the horizontal distance from the total station to the building by EDM or tape
- Multiple the horozontal distance by the tangent of the angle. Then the height of the station is added. This gives you the overall height.
What is the formula used to measure the height of a building
Tan θ = opp / adj
e.g. an angle of 38°11’12’’ is recorded with a horizontal distance of 24.6m with a recorded height at 2.2m. 24.6 x tan(38°11’12’’)+2.2 = 21.549.
What BS governs the use of theodolites
BS 7334-4:1992 Measuring instruments for building construction. Methods for determining accuracy in use of theodolites.
What instruments are used in traverse leveling
A dumpy level consists of a telescope-like device fitted on a tripod stand and used for establishing or verifying points in the same horizontal plane. Together with a vertical staff, it is used to measure height differences.
How do you set up a dumpy level
Setting up a level
- Find a known height (benchmark datum) location near the spot you want to measure.
- Set your tripod up approximatly level near the spot you want to measure.
- Connect your device to the tripod and position it over 2 leveling screws.
- Level the device by adjusting the 2 leveling screws simaltaniously.
- Turn your telescope 90 degrees and adjust the third leveling screw.
- If the bubble is not centered in any of the 3 positions, repeat the leveling process until it is.