Major Design Flashcards

1
Q

What is the scope of major drainage system?

A

Surface flow paths along road network.
Floodway reserves
Floodplain reserves along established waterways
Retarding basins

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Road flow capacity equation

A

Manning’s equation Q=(AR^0.67S^0.5)/n

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Retrofitting in developed areas are caused by and done by?

A

Inadequate planning in the first instance
Changes over time(increased imperviousness above predicted)

Retrofit works funded by rates or redevelopment drainage scheme
Require on-site Detention

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

On-site requirements

A

On site detention;
Flow detention within individual properties( small regarding basins and specially-designed rainwater tanks)
Requirement is specified as either storage volume or maximum flow rate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

retarding basin purpose and location

A

Installed in public open space eg. Football ovals

Detain flow to mitigate peak flow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Drainage schemes

A

Plan of major drainage components, with costings and contributions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Other considerations for RB

A

Public use-availability for sporting activities (consider for inundation frequency)
Public safety-max depth, fill rate, velocity; slopes
Integration of water quality, environmental, habitat objectives

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is emphasis through major design and why?

What does major systems rely on?

A

Planning. Planning is needed to protect plow paths from development.
Overland flow paths.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly