LT Flashcards
Consistent documentation
Walking and bicycling distance-safe path
Safe walking paths-side walk
Safe bicycling path - low target vehicle speed, on street bicycle lanes, off street bicycle path or trails
Total vehicle parking capacity-offstreet spaces inside or outside project boundary
Preferred parking
LT Credits
LEED for ND location Sensitive land protection High priority site Surrounding density and diverse uses Access to quality trasit Bicycle facilities Reduced parking footprint Green vehicles
LT and SS
SS- onsite ecosystem services
LT- existing features of the surrounding community and their impact on occupants’ behavior and environmental performance
Walking and bicycling distance
Safe path
Not a straight line radius
Safe walking path
Sidewalks, crosswalk, all weather surface footpaths, pedestrian facility
Safe bicycling path
Streets with low target vehicle speed, on street bicycle lanes and off street bicycle paths or trails
Total vehicle parking capacity
Includes off street spaces that the project buildings users can use both inside and outside the project boundary
Not included as parking space
Bicycle or motorbike spaces
I street parking space
Parking spaces for inventory and fleet vehicles unless used regularly
Preferred parking
Closest to main entrance of the project
LT all credits include:
LEED for ND development location Sensitive land High priority site Surrounding density and diverse uses Access to quality transit Bicycle facilities reduced parking footprint Green vehicles
Infill sites
75%or more of the total land area is previously developed
Credit path for High Priority Site
Historic district 1/2 mile
Priority designation
Brownfield remediation- asbestos and ithe contaminant in debris or inside buildings whether demolished of remaining do not count as contamination
Code HIPBROWN
Combined density
22k
35k
Sq.ft/acre of build-able land
Residential density
7 or12 DU/acre
Nonresidential densities
.5/.8 FAR
Diverse uses
1/2 mile (800 meter) walking distance
4-7 1pt
8 2pts
For planned transportation resources
It must be funded, sited, and under construction by the date of certificate of occupancy and complete within 24 months
For rerouted outside the required distance
Can be counted if less than 2 yrs and local transit agency commited to restore service
For reduced parking footprint credit how many percent should be offered for preferred parking and if no off street parking?
5% and none
Green score for vehicles
45
Minimum discount for parking rate for green vehicles
20%
ACEEE
American Council for an Energy Efficient economy
EVSE in all parking spaces
2%
2E inEVSE
Electrical vehicle supply equipment
Credit path for green vehicles forNC, CS, dc, hos, healthcare, retail
Electric vehicle charging
Liquid gas or battery facilities
2%