IP Flashcards
Integrative Project Planning and Design
Prerequisite for Healthcare only
Maximize the chances for cost effective, integrated adoption of green design and construction strategies, use human health as a fundamental criterion for building operational strategies as well as design and construction. USE INNOVATIVE TECHNIQUES AND APPROACHES.
Prerequisite for IPP
Owner’s Project Requirements Document
Preliminary Rating Goals- create team ASAP preferably before schematic design; leed action plan(certification to pursue, credits and responsible parties)
Integrated Project Team
Design Charrette- 4 hour meeting
Project Phases
Pre Design Schematic Design Design development Construction documents Construction administration Occupation/operation
Integrative Process
Use an early analysis if the interrelationships among system to support cost effective high performance project outcomes
Itemsanalyzed in IPC
Energy related system
Water related system
Energy related system discovery
Complete preliminary ‘simple box’ energy modeling analysis
Evaluate at least 2 potential strategies related to:
Site conditions -exterior lightig,shading,hardscape
Massing & orientation -effect on energy consumption, hvac sizing, lighting, renewable opportunity
Basic envelope attributes- insulation etc
Lighting levels -interior lights,
Thermal comfort ranges-
Plug&process load needs-
ENERGY RELATED SYSTEM IMPLEMENTATION
Documenting analysis on discovery and:
Site bldg program
Building form and geometry
Building envelope and facade treatment
Environmentally Responsive Design Process
ANSI Consensus National Standard Guide 2.0 for Design and Construction of Sustainable Buildings and Communities
PRE DESIGN DESIGN Schematic design Design development Construction documents BID CONSTRUCTION OCCUPANCY
Charrette
Meeting of all stakeholders
Establish project goals
Resolve conflicts
Map solution