Loss of secondary Flashcards

1
Q

Sources of water for secondary

A
  1. Cst
  2. other unit cst
  3. esw
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

normal secondary pumps available

A
  1. hotwell
  2. condensate booster
  3. mainfeed pumps
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Pumps available for trip

A
  1. Tdafp
  2. mdafp
  3. hotwell
  4. condensate booster pump
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3 methods to remove heat from the core

A
  1. transfer heat to mainfeedwater via steam generator
  2. transfer heat to ccw via rhr hx
  3. transfer heat to containment atmosphere via pzr porvs
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

least desirable method to remove heatr from the core

A

feed and bleed via the pzr porvs

it creates a loca in containment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

PRT rupture disk setpoint

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

what valve do we use to crosstie CST’s

A

12-crv-51

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Aux Feed Tasks

A
  1. locally reset TDAFP
  2. local operation of afw feed valves
  3. cross tie with other unit
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

AEO tasks if we cant restart feedwater pumps

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

why do we trip RCP’s when attempting to restore main feedwater

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

SG safety setpoints

A
  1. two at 1065
  2. two at 1075
  3. one at 1085
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

how much reactor power is each safety rated for

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Steam Dump Trips

A
  1. Low vacuum (20.6 inches)
  2. no circ water pump breakers closed
  3. crid 2 de-energized
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

what pressure are the sg porvs set at

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

how much reactor power is each porv rated for

A

2.5%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

In what order would we recover from loss of feedwater supply

A
  1. aux feed pumps
  2. aux feed with other cst
  3. other unit cst and aux feed pumps
  4. restart main feed pumps
  5. feed through main feed flowpath with condensate booster pumps
17
Q

how would we recover from loss of steam dumps

A

bleed out of the porv

18
Q

what if we cant restore feed water

A

feed and bleed eccs supply to pzr porv to prt to containmnet