Loss of NNI / Loss ICW Flashcards
How do the power supplies for NNI operate?
What major actions are taken for a loss of NNI X AC and DC?
Trip Rx, Close RCS Makeup Block (PZR controller fails 50%) and maintain PZR lvl using HPI block 90 - 100”, CV-1206 in override, Manually operate PZR heaters
What major actions are taken for a loss of NNI X DC only?
Ensure FW demands, RX demand and diamond in manual, CV-1206 in override, Isolate RCS makeup and use HPI block to control PZR lvl 200 - 220”, bypass CV-1207 and operate heaters in manual.
What major actions are taken for a loss of NNI X AC only?
Trip RX, Operate HPI block to control pzr lvl, Close CV-1206 and operate PZR heaters in manual.
What major actions are taken for a loss of NNI Y?
If MFW on D/P control then take MFPs to hand.
What are the effects for loss of NNI power supplies?
Loss NNI X AC & DC (Same for DC only): CV-1207 and CV-1235 fail to 50% / PZR htr auto controls fail
NNI X AC Only: CV-1207 fails closed / CV-1235 fails indetereminate / PZR htrs fail off
NNI Y: MFP DP fails low / LD flow indication unavailable
What major actions are taken if all but one ICW pump running?
Place failed pump in PTL, Open all crossconnects, isolate letdown and one letdown cooler, isolate icw to SFP coolers and maintain < 2500 gpm. Secure additional loads that aren’t needed, restore LD.