Abnormal SD & CD AOPs Flashcards

1
Q

What actions are taken for the ERV isolation valve in natural circ CD?

A

If closed, then

  • Open and maintain CV-1000 open for duration or CD

or

  • Cycle every 100 deg F during CD to prevent thermal binding.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What caution addresses SG level > 40” and RCS temp > 290 deg F?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What indications are expected if steam formation occurs in idle SG loops?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the tube-shell-dt limits with one SG dry?

A

150 deg (tubes colder) in emergency

100 deg F (tubes colder) non-emergency

If steam bubble indicated in idle loop and ability to depressurize inhibited then eliminate voids by operating loop high point vents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are cooldown rates?

A

100 deg/hr above 300 deg F

50 deg/hr from 170 to 300 deg F

25 deg/hr below 170 deg F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How is cooldown rate controlled when feeding ruptured SG?

A

SGs might not pressurize and SG level might not be established; therefore, cooldown is controlled by adjusting feed rate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What actions are taken in natural circ cooldown if indications of RV head steam bubble occurs?

A

Terminate depressurization and pressurize slightly to reduce size of bubble and continue cooldown rate at < 50 deg/hr.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How is RCS pressure controlled during natural circ cooldown?

A

1) Cycling PZR high point vents (Quench tank pressure of 100# will blow rupture disk).
2) Cycle ERV
3) Perform in surge and out surge of PZR by placing PZR heaters in off and cycle PZR level between 60” and 200”.

In order of Preference

If offsite power available, adjusting Letdown flow is the preferred action.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When is the ES HPI and LPI pump secured during natural circ cooldown when RB sump recirc in progress?

A

If SCM adequate, total HPI flow < 475 gpm and both LPI trains available, secure ES HPI pump and LPI pump and align for DH operation per 1104.004 DHR during cooldown section.

If not on RB sump recirc, place one LPI pump in DH operation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When is transition made to ESAS in small break LOCA cooldown?

A

If LPI flow is 2800 gpm with 2 pumps in service or > 3050 gpm with 1 LPI pump in service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What actions are taken at 700 psig RCS pressure?

A

CFT outlet breakers are closed and valves are closed and locked open.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What actions are taken when RCS pressure < 450 psig and RCS temp > 271 deg F?

A

Secure the 3rd running RCP down to 2 in service.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When is DH directed to be placed in service?

A

CET < 275 deg F and RCS pressure < 250#

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What action is taken at 450# SG pressure in forced flow cooldown?

A

Aux FW pump secured.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly