Looksfam Flashcards

1
Q

Excavator Production

A

2.75 BCM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Hydraulic Excavator

A

113 LCM/ hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Shovels
(Hydraulic Shovels - Common Earth)

A

290 LCM/ hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Draglines
(Dragline Production)

A

165 LCM / hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Clamshells
(Medium Weight - Clamshells)

A

53 LCM / hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Clamshells
(Medium Weight - Clamshells)

A

53 LCM / hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Dozer Production
(Powershift Crawler)

A

271 LCM / hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Loader Production
(Wheel Loader)

A

168 LCM / hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Rolling and Grade
(Wheel Tractor - Scraper)

A

9100 kg, 10% ( + grade )
9100 kg, 0% (- grade)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Rolling and Grade
(Rubber- tired scraper)

A

5525 kg

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Effect of Tractor
(Four-wheel drive, “can tractor perform these conditions?”)

A

9000 kg scraper
The tractor cannot perform these conditions because the maximum pull as limited by traction is less

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Scraper Production
(Single Engine Two-Axle Tractor)

A

192 BCM / hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Push loading in Scraper
(Back track & Chain Loading methods )

A

3 & 2 (Number of scrapers required)
4.3 and 6.5 (Number of Scrapers per pusher)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Number of Pushers
(Single Scraper assuming adequate pusher)

A

1112 BCM / hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Haul Units
(Shovel / Truck Operation)

A

11 trucks and 512 BCM
9 trucks and 186 BCM/hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Compacting and Finishing

A

23.1 hr