Limits (Ch. 4) Flashcards
1
Q
Turbine Gas Temperature
TGT
IRP DECUs
A
- 0-810°C Continuous
- 810-851 30 minutes
- 851-903 2.5 minutes
- 903-949 12 seconds
- 949 maximum
2
Q
TGT
MRP EDECUs
A
- 0-810°C Continuous
- 810-851 30 min
- 851-878 10 min
- 878-903 2.5 min
- 903-949 12 sec
- 949 max
3
Q
Np
Power Turbine Speed
A
- <96% Avoid
- 96-105 Continuous
- 105-120% 12 seconds
- 120% Maximum
4
Q
Nr
Main Rotor Speed
A
- <96% Avoid
- 96-101 Continuous
- 101-120 Precautionary
- 120% Max
- >120% 123%, Maximum for FCF only
- 127, 137, &142 Overspeed Latch
5
Q
Dual Engine Torque
<80 KIAS
A
- 0-120% Continuous
- 120-144% 10 seconds
- 144% Maximum
6
Q
Dual Engine Torque
>80 KIAS
A
- 0-106% Continuous
- 106-127% 10 seconds
- 127% Maximum
Dual Engine Torque Limits apply when both engines are above 65% torque.
7
Q
Single Engine Torque
A
- 0-135% Continuous
- 135-144 10 seconds
- 144% Maximum
8
Q
Ng
Gas Generator Speed
A
- 0-98% Continuous
- 98-102.2 Continuous
- 102.2-105.1 12 Seconds
- 105.1% Maximum
9
Q
XMSN T
A
- -50 to 105°C Continuous
- 105 to 120 Precautionary
- 120 Maximum
10
Q
XMSN Pressure
A
- 20psi minimum
- 20-30 idle and transient
- 30-65 continuous (45 to 60 in level flight)
- 65-130 precautionary
- 130 Maximum
11
Q
ENG Oil Temp
A
- -50 to 135°C Continuous
- 135-150 30 min
- 150 Maximum
12
Q
ENG Oil Pressure
A
- 22psi Minumum
- 22-26 Precautionary
- 26-100 Continuous
- 100-120 Precautionary
- 120 psi Maximum
*Normal Idle range is 22 to 55 psi.
13
Q
Engine Starter Limitations
A
- <16°C
- first cycle —————60 seconds
- seconds cycle———60 seconds
- third cycle—————60 seconds
- fourth cycle————-30 minutes
- 16 to 52 °C
- first cycle—————-60 seconds
- second cycle———-30 minutes
- engine motor (ignition off)
- 2 minutes engaged——-5 min disengaged
- 2 minutes engaged——30 min disengaged
14
Q
Minimum Planned Fuel on Deck
A
- Shall be no less than 600 lbs
15
Q
APU limitations
A
- SHALL be limited to essential operations only.
- acceptable uses in flight includes:
- emergency procedures
- single-engine training
- practice autorotations
- powering ECS during extreme temp ops