PROPRIETARY SPECIFICATIONS

A

Call for desired materials, products, systems, and equipment by their trade names and model numbers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

CLOSED SPECIFICATIONS

A

Require a particular brand or trade name and do not permit substitution.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

OPEN SPECIFICATIONS

A

name several (usually 3) acceptable materials, products, or systems, and contractors may use any of them.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

PERFORMANCE SPECIFICATIONS

A

Define products or systems by describing desired end results that are performance oriented.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

REFERENCE SPECIFICATIONS

A

refer to quality standards established by recognized testing authorities or by the federal government.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

DESCRIPTIVE SPECIFICATIONS

A

Are the most detailed of all specifications. They describe all components of products, their arrangement and methods of assembly, physical and chemical properties, arrangement and relationship of parts, and numerous other details and requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Cash Allowance Specifications

A

Bidders set aside money to be applied to the construction work at the architects direction. Cash Allowance specifications are used when full information on levels of quality has not been determined or is not available at the time bids are solicited. Hardware and carpeting are often handled in this manner.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

CONSTRUCTION MANAGEMENT

A

Defined as activities over and above normal architectural and engineering services, conducted during the pre-design, design, and construction phases, which contribute to the control of time and cost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

CONSTRUCTION DOCUMENTS _Include:

A
Bidding Requirements 
Contract Forms
Conditions of the Contract 
Specifications
 Drawings
Addenda 
Contract Modifications
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

BID DOCUMENTS (Do not Include Documents after bid opening) include_

A
Bidding Requirements 
Contract Forms
Conditions of the Contract 
Specifications
 Drawings
Addenda
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

CONTRACT DOCUMENTS (Do not include bidding Requirements)

A
Contract Forms
Conditions of the Contract 
Specifications
 Drawings
Addenda 