Lecture 11 Flashcards

1
Q

construction stage 1

A

planning and design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

construction sstage 2

A

Site preapration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

construction sstage 3

A

foundation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

construction sstage 4

A

Framing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

construction sstage 5

A

Electrical Plumbing Hvac

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

construction sstage 6

A

insulation and drywall

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

construction sstage 7

A

finish work

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

construction sstage 8

A

Closeout

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

heavy duty machines that are used to move large quantities of soil sand or other materials

A

Bulldozers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

versatile machines to do a variety of tasks, digging trenches removing debris shaping terraub can be equipeed with buckets harrmers etc

A

excavators

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

smaller xcavatores for small projects

A

backhoes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

machines that level and smooth the ground, they have a large blade that can be adjusted to different angles

A

Graders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

machine for compacting soil asphalt and other materials

A

roller

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

who uses floorplan

A

architects builders contractors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

site preparation features

A

safety, access, leveling, drainage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

site preparation temp features

A

construction activities, worker comfort, temp office space, compliance

17
Q

on undevelopped sites, constrruction may begin with ..

A

grubbing and clearing in which trees stumps large roots and other surface materials are removed with heavy machinery

18
Q

after removing roots and other surface materials

A

topsoil is scraped away until reuse at end of contruction

19
Q

why excavation?

A

to reach aduquate soil for a foundation

20
Q

in soils to excavate you can use

A

bulldozers backhoes scrapers trenching machines etc etc

21
Q

in rock to excavate you can use

A

power shovels, pnuematic hammers or blasting, or hydraulic splitters