LT - When protecting sensitive land, how far should all major developments be from a water body?
100’
LT - When protecting sensitive land, how far should all major developments be from a wetland?
50’
LT - How far of a radius from the project boundary should be measured for surrounding density?
1/4 mile
LT - What distance is considered the farthest a diverse use can be from the main entrance of a project?
1/2 mile walking distance
LT - What are the key numbers for the surrounding density calculations for a project?
- 7 Dwelling Units/Acre
- .5 FAR of non-residential
- 22,000sf/acre of buildable land
LT - What distance is the maximum for walking to a bus/streetcar/rideshare from a project to be considered access to quality transit?
1/4 mile
LT - What distance is the maximum for walking to a rail station or ferry terminal from a project to be considered access to quality transit?
1/2 mile
LT - Basic bike facility numbers
- 100’ from building entrance
- 200’ from bicycle network
LT - Commercial bike facility numbers
- 2.5% short term for peak visitors
- Minimum 4/building
- 5% long term
- 1 shower/100 + 1 shower/next 150
LT - Residential bike facility numbers
- 2.5% short term for peak visitors
- Minimum 4/building
- 30% long term
LT - Parking reduction required for non-dense or non-served by transit
- 20%
- 60% exemplary
LT - Parking reduction for dense, transit-served, sites
- 40%