ITTO Detailed Flashcards

1
Q

Develop Project Charter INPUTS

A

Develop Project Charter INPUTS

Business Documents
Agreements
Enterprise Environmental Factors
Organizational Process Assets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Develop Project Charter TOOLS/TECHNIQUES

A

Develop Project Charter TOOLS/TECHNIQUES

Expert Judgment
Data Gathering
Interpersonal & Team Skills
Meetings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Develop Project Charter OUTPUTS

A

Develop Project Charter OUTPUTS

Project Charter
Assumption Log

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Develop Project Management Plan INPUTS

A

Develop Project Management Plan INPUTS

Project Charter
Outputs from Other Processes
Enterprise Environmental Factors
Organizational Process Assets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Develop Project Management Plan TOOLS/TECHNIQUES

A

Develop Project Management Plan TOOLS/TECHNIQUES

Expert Judgment
Data Gathering
Interpersonal and Team Skills
Meetings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Develop Project Management Plan OUTPUT

A

Develop Project Management Plan OUTPUT

Project Management Plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Direct and Manage Project Work INPUT

A

Direct and Manage Project Work INPUT

Deliverables
Work Performance Data
Issue Log
Change Requests
Project Management Plan Updates
Project Documents Updates
Organizational Process Assets Updates
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Direct and Manage Project Work TOOLS/TECHNIQUES

A

Direct and Manage Project Work TOOLS/TECHNIQUES

Expert Judgment
Project Management Information System
Meetings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Direct and Manage Project Work OUTPUT

A

Direct and Manage Project Work OUTPUT

Deliverables
Work Performance Data
Issue Log
Change Requests
Project Management Plan Updates
Project Documents Updates
Organizational Process Assets Updates
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Manage Project Knowledge INPUT

A

Manage Project Knowledge INPUT

Project Management Plan
Project Documents
Deliverables
Enterprise Environmental Factors
Organizational Process Assets
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Manage Project Knowledge TOOLS/TECHNIQUES

A

Manage Project Knowledge TOOLS/TECHNIQUES

Expert Judgment
Knowledge Management
Information Management
Interpersonal & Team Skills

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Manage Project Knowledge OUTPUT

A

Manage Project Knowledge OUTPUT

Lessons Learned Register
Project Management Plan Updates
Organizational Process Assets Updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Monitor and Control Project Work INPUT

A

Monitor and Control Project Work INPUT

Project Management Plan
Project Documents
Work Performance Information
Agreements
Enterprise Environmental Factors
Organizational Process Assets
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Monitor and Control Project Work TOOLS/TECHNIQUES

A

Monitor and Control Project Work TOOLS/TECHNIQUES

Expert Judgment
Data Analysis
Decision Making
Meetings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Monitor and Control Project Work OUTPUT

A

Monitor and Control Project Work OUTPUT

Work Performance Reports
Change Requests
Project Management Plan Updates
Project Documents Updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Perform Integrated Change Control INPUT

A

Perform Integrated Change Control INPUT

Project Management Plan
Project Documents
Work Performance Reports
Change Requests
Enterprise Environmental Factors
Organizational Process Assets
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Perform Integrated Change Control TOOLS/TECHNIQUES

A

Perform Integrated Change Control TOOLS/TECHNIQUES

Expert Judgment
Change Control Tools
Data Analysis
Decision Making
Meetings
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Perform Integrated Change Control OUTPUT

A

Perform Integrated Change Control OUTPUT

Approved Change Requests
Project Management Plan Updates
Project Documents Updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Close Project or Phase INPUT

A

Close Project or Phase INPUT

Project Charter
Project Management Plan
Project Documents
Accepted Deliverables
Business Documents
Agreements
Procurement Documentation
Organizational Process Assets
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Close Project or Phase TOOLS/TECHNIQUES

A

Close Project or Phase TOOLS/TECHNIQUES

Expert Judgment
Data Analysis
Meetings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Close Project or Phase OUTPUT

A

Close Project or Phase OUTPUT

Expert Judgment
Data Analysis
Meetings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Plan Scope Management INPUT

A

Plan Scope Management INPUT

Project Charter
Project Management Plan
Enterprise Environmental Factors
Organizational Process Assets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Plan Scope Management TOOLS/TECHNIQUES

A

Plan Scope Management TOOLS/TECHNIQUES

Expert Judgment
Data Analysis
Meetings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Plan Scope Management OUTPUT

A

Plan Scope Management OUTPUT

Scope Management Plan
Requirements Management Plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Collect Requirements INPUT
Collect Requirements INPUT ``` Project Charter Project Management Plan Project Documents Business Documents Agreements Enterprise Environmental Factors Organizational Process Assets ```
26
Collect Requirements TOOLS/TECHNIQUES
Collect Requirements TOOLS/TECHNIQUES ``` Project Charter Project Management Plan Project Documents Business Documents Agreements Enterprise Environmental Factors Organizational Process Assets ```
27
Collect Requirements OUTPUT
Collect Requirements OUTPUT Requirements Documentation Requirements Traceability Matrix
28
Define Scope INPUT
# Define Scope INPUT ``` Project Charter Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets ```
29
Define Scope TOOLS/TECHNIQUES
# Define Scope TOOLS/TECHNIQUES ``` Expert Judgment Data Analysis Decision Making Interpersonal & Team Skills Product Analysis ```
30
Define Scope OUTPUT
# Define Scope OUTPUT Project Scope Statement | Project Documents Updates
31
Create WBS INPUT
Create WBS INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
32
Create WBS TOOLS/TECHNIQUES
Create WBS TOOLS/TECHNIQUES Expert Judgment Decomposition
33
Create WBS OUTPUT
Create WBS OUTPUT Scope Baseline Project Documents Updates
34
Validate Scope INPUT
Validate Scope INPUT Project Management Plan Project Documents Verified Deliverables Work Performance Data
35
Validate Scope TOOLS/TECHNIQUES
Validate Scope TOOLS/TECHNIQUES Inspection Decision Making
36
Validate Scope OUTPUT
Validate Scope OUTPUT Accepted Deliverables Work Performance Information Change Requests Project Documents Updates
37
Control Scope INPUT
Control Scope INPUT Project Management Plan Project Documents Work Performance Data Organizational Process Assets
38
Control Scope TOOLS/TECHNIQUES
Control Scope TOOLS/TECHNIQUES Data Analysis
39
Control Scope OUTPUT
Control Scope OUTPUT Work Performance Information Change Requests Project Management Plan Updates Project Documents Updates
40
Plan Schedule Management INPUT
Plan Schedule Management INPUT Change Requests Project Management Plan Enterprise Environmental Factors Organizational Process Assets
41
Plan Schedule Management TOOLS/TECHNIQUES
Plan Schedule Management TOOLS/TECHNIQUES Expert Judgment Data Analysis Meetings
42
Plan Schedule Management OUTPUT
Plan Schedule Management OUTPUT Schedule Management Plan
43
Define Activities INPUT
# Define Activities INPUT Project Management Plan Enterprise Environmental Factors Organizational Process Assets
44
Define Activities TOOLS/TECHNIQUES
# Define Activities TOOLS/TECHNIQUES Expert Judgment Decomposition Rolling Wave Planning Meetings
45
Define Activities OUTPUT
# Define Activities OUTPUT ``` Activity List Activity Attributes Milestone List Change Requests Project Management Plan Updates ```
46
Sequence Activities INPUT
Sequence Activities INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
47
Sequence Activities TOOLS/TECHNIQUES
Sequence Activities TOOLS/TECHNIQUES Precedence Diagramming Method Dependency Determination & Integration Leads & Lags Project Management Information System
48
Sequence Activities OUTPUT
Sequence Activities OUTPUT Project Schedule Network Diagrams Project Documents Updates
49
Estimate Activity Durations INPUT
Estimate Activity Durations INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
50
Estimate Activity Durations TOOLS/TECHNIQUES
Estimate Activity Durations TOOLS/TECHNIQUES ``` Expert Judgment Analogous Estimating Parametric Estimating Three-Point Estimating Bottom-Up Estimating Data Analysis Decision Making Meetings ```
51
Estimate Activity Durations OUTPUT
Estimate Activity Durations OUTPUT Duration Estimates Basis of Estimates Project Documents Updates
52
Develop Schedule INPUT
Develop Schedule INPUT ``` Project Management Plan Project Documents Agreements Enterprise Environmental Factors Organizational Process Assets ```
53
Develop Schedule TOOLS/TECHNIQUES
Develop Schedule TOOLS/TECHNIQUES ``` Schedule Network Analysis Critical Path Method Resource Optimization Data Analysis Leads & Lags Schedule Compression Project Management Information System Agile Release Planning ```
54
Develop Schedule OUTPUT
Develop Schedule OUTPUT ``` Schedule Baseline Project Schedule Schedule Data Project Calendars Project Management Plan Updates Project Documents Updates ```
55
Control Schedule INPUT
Control Schedule INPUT Project Management Plan Project Documents Work Performance Data Organizational Process Assets
56
Control Schedule TOOLS/TECHNIQUES
Control Schedule TOOLS/TECHNIQUES ``` Data Analysis Critical Path Method Project Management Information System Resource Optimization Leads & Lags Schedule Compression ```
57
Control Schedule OUTPUT
Control Schedule OUTPUT ``` Work Performance Information Schedule Forecasts Change Requests Project Management Plan Updates Project Documents Updates ```
58
Plan Cost Management INPUT
Plan Cost Management INPUT Project Charter Project Management Plan Enterprise Environmental Factors Organizational Process Assets
59
Plan Cost Management TOOLS/TECHNIQUES
Plan Cost Management TOOLS/TECHNIQUES Expert Judgment Data Analysis Meetings
60
Plan Cost Management OUTPUT
Plan Cost Management OUTPUT Cost Management Plan
61
Estimate Costs INPUT
Estimate Costs INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
62
Estimate Costs TOOLS/TECHNIQUES
Estimate Costs TOOLS/TECHNIQUES ``` Expert Judgment Analogous Estimating Parametric Estimating Bottom-Up Estimating Three-Point Estimating Data Analysis Project Management Information System Decision Making ```
63
Estimate Costs OUTPUT
Estimate Costs OUTPUT Cost Estimates Basis of Estimates Project Documents Updates
64
Determine Budget INPUT
Determine Budget INPUT ``` Project Management Plan Project Documents Business Documents Agreements Enterprise Environmental Factors Organizational Process Assets ```
65
Determine Budget TOOLS/TECHNIQUES
Determine Budget TOOLS/TECHNIQUES ``` Expert Judgment Cost Aggregation Data Analysis Historical Information Review Funding Limit Reconciliation Financing ```
66
Determine Budget OUTPUT
Determine Budget OUTPUT Cost Baseline Project Funding Requirements Project Documents Updates
67
Control Costs INPUT
Control Costs INPUT ``` Project Management Plan Project Documents Project Funding Requirements Work Performance Data Organizational Process Assets ```
68
Control Costs TOOLS/TECHNIQUES
Control Costs TOOLS/TECHNIQUES Expert Judgment Data Analysis To-Complete Performance Index Project Management Information System
69
Control Costs OUTPUT
Control Costs OUTPUT ``` Work Performance Information Cost Forecasts Change Requests Project Management Plan Updates Project Documents Updates ```
70
Plan Quality Management INPUT
Plan Quality Management INPUT ``` Project Charter Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets ```
71
Plan Quality Management TOOLS/TECHNIQUES
Plan Quality Management TOOLS/TECHNIQUES ``` Expert Judgment Data Gathering Data Analysis Decision Making Data Representation Test & Inspection Planning Meetings ```
72
Plan Quality Management OUTPUT
Plan Quality Management OUTPUT Quality Management Plan Quality Metrics Project Management Plan Updates Project Documents Updates
73
Manage Quality INPUT
Manage Quality INPUT Project Management Plan Project Documents Organizational Process Assets
74
Manage Quality TOOLS/TECHNIQUES
Manage Quality TOOLS/TECHNIQUES ``` Data Gathering Data Analysis Decision Making Data Representation Audits Design for X Problem Solving Quality Improvement Methods ```
75
Manage Quality OUTPUT
Manage Quality OUTPUT ``` Quality Reports Test & Evaluation Documents Change Requests Project Management Plan Updates Project Documents Updates ```
76
Control Quality INPUT
Control Quality INPUT ``` Project Management Plan Project Documents Approved Change Requests Deliverables Work Performance Data Enterprise Environmental Factors Organizational Process Assets ```
77
Control Quality TOOLS/TECHNIQUES
Control Quality TOOLS/TECHNIQUES ``` Data Gathering Data Analysis Inspection Testing/Product Evaluations Data Representation Meetings ```
78
Control Quality OUTPUT
Control Quality OUTPUT ``` Quality Control Measurements Verified Deliverables Work Performance Information Change Requests Project Management Plan Updates Project Documents Updates ```
79
Plan Resource Management INPUT
Plan Resource Management INPUT ``` Project Charter Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets ```
80
Plan Resource Management TOOLS/TECHNIQUES
Plan Resource Management TOOLS/TECHNIQUES Expert Judgment Data Representation Organizational Theory Meetings
81
Plan Resource Management OUTPUT
Plan Resource Management OUTPUT Resource Management Plan Team Charter Project Documents Updates
82
Estimate Activity Resources INPUT
Estimate Activity Resources INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
83
Estimate Activity Resources TOOLS/TECHNIQUES
Estimate Activity Resources TOOLS/TECHNIQUES ``` Expert Judgment Bottom-Up Estimating Analogous Estimating Parametric Estimating Data Analysis Project Management Information System Meetings ```
84
Estimate Activity Resources OUTPUT
Estimate Activity Resources OUTPUT Resource Requirements Basis of Estimates Resource Breakdown Structure Project Documents Updates
85
Acquire Resources INPUT
Acquire Resources INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
86
Acquire Resources TOOLS/TECHNIQUES
Acquire Resources TOOLS/TECHNIQUES Decision Making Interpersonal & Team Skills Pre-Assignment Virtual Teams
87
Acquire Resources OUTPUT
Acquire Resources OUTPUT ``` Physical Resource Assignments Project Team Assignments Resource Calendars Change Requests Project Management Plan Updates Project Documents Updates Enterprise Environmental Factors Updates Organizational Process Assets Updates ```
88
Develop Team INPUT
Develop Team INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
89
Develop Team TOOLS/TECHNIQUES
Develop Team TOOLS/TECHNIQUES ``` Colocation Virtual Teams Communication Technology Interpersonal & Team Skills Recognition & Rewards Training Individual & Team Assessments Meetings ```
90
Develop Team OUTPUT
Develop Team OUTPUT ``` Team Performance Assessments Change Requests Project Management Plan Updates Project Documents Updates Enterprise Environmental Factors Updates Organizational Process Assets Updates ```
91
Manage Team INPUT
Manage Team INPUT ``` Project Management Plan Project Documents Work Performance Reports Team Performance Assessments Enterprise Environmental Factors Organizational Process Assets ```
92
Manage Team TOOLS/TECHNIQUES
Manage Team TOOLS/TECHNIQUES Interpersonal & Team Skills Project Management Information System
93
Manage Team OUTPUT
Manage Team OUTPUT Change Requests Project Management Plan Updates Project Documents Updates Enterprise Environmental Factors Updates
94
Control Resources INPUT
Control Resources INPUT ``` Project Management Plan Project Documents Work Performance Data Agreements Organizational Process Assets ```
95
Control Resources TOOLS/TECHNIQUES
Control Resources TOOLS/TECHNIQUES Data Analysis Problem Solving Interpersonal & Team Skills Project Management Information System
96
Control Resources OUTPUT
Control Resources OUTPUT Work Performance Information Change Requests Project Management Plan Updates Project Documents Updates
97
Plan Communications Management INPUT
Plan Communications Management INPUT ``` Project Charter Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets ```
98
Plan Communications Management TOOLS/TECHNIQUES
Plan Communications Management TOOLS/TECHNIQUES ``` Expert Judgment Communications Requirements Analysis Communication Technology Communication Models Communication Methods Interpersonal & Team Skills Data Representation Meetings ```
99
Plan Communications Management OUTPUT
Plan Communications Management OUTPUT Communications Management Plan Project Management Plan Updates Project Documents Updates
100
Manage Communications INPUT
Manage Communications INPUT ``` Project Management Plan Project Documents Work Performance Reports Enterprise Environmental Factors Organizational Process Assets ```
101
Manage Communications TOOLS/TECHNIQUES
Manage Communications TOOLS/TECHNIQUES ``` Communication Technology Communication Methods Communication Skills Project Management Information System Project Reporting Interpersonal & Team Skills Meetings ```
102
Manage Communications OUTPUT
Manage Communications OUTPUT Project Communications Project Management Plan Updates Project Documents Updates Organizational Process Assets Updates
103
Monitor Communications INPUT
Monitor Communications INPUT ``` Project Management Plan Project Documents Work Performance Data Enterprise Environmental Factors Organizational Process Assets ```
104
Monitor Communications TOOLS/TECHNIQUES
Monitor Communications TOOLS/TECHNIQUES ``` Expert Judgment Project Management Information System Data Representation Interpersonal & Team Skills Meetings ```
105
Monitor Communications OUTPUT
Monitor Communications OUTPUT Work Performance Information Change Requests Project Management Plan Updates Project Documents Updates
106
Plan Risk Management INPUT
Plan Risk Management INPUT ``` Project Charter Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets ```
107
Plan Risk Management TOOLS/TECHNIQUES
Plan Risk Management TOOLS/TECHNIQUES Expert Judgment Data Analysis Meetings
108
Plan Risk Management OUTPUT
Plan Risk Management OUTPUT Risk Management Plan
109
Identify Risks INPUT
Identify Risks INPUT ``` Project Management Plan Project Documents Agreements Procurement Documentation Enterprise Environmental Factors Organizational Process Assets ```
110
Identify Risks TOOLS/TECHNIQUES
Identify Risks TOOLS/TECHNIQUES ``` Expert Judgment Data Gathering Data Analysis Interpersonal & Team Skills Prompt Lists Meetings ```
111
Identify Risks OUTPUT
Identify Risks OUTPUT Risk Register Risk Report Project Documents Updates
112
Perform Qualitative Risk Analysis INPUT
Perform Qualitative Risk Analysis INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
113
Perform Qualitative Risk Analysis TOOLS/TECHNIQUES
Perform Qualitative Risk Analysis TOOLS/TECHNIQUES ``` Expert Judgment Data Gathering Data Analysis Interpersonal & Team Skills Risk Categorization Data Representation Meetings ```
114
Perform Qualitative Risk Analysis OUTPUT
Perform Qualitative Risk Analysis OUTPUT Project Documents Updates
115
Perform Quantitative Risk Analysis INPUT
Perform Quantitative Risk Analysis INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
116
Perform Quantitative Risk Analysis TOOLS/TECHNIQUES
Perform Quantitative Risk Analysis TOOLS/TECHNIQUES ``` Expert Judgment Data Gathering Interpersonal & Team Skills Representations of Uncertainty Data Analysis ```
117
Perform Quantitative Risk Analysis OUTPUT
Perform Quantitative Risk Analysis OUTPUT Project Documents Updates
118
Plan Risk Responses INPUT
Plan Risk Responses INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
119
Plan Risk Responses TOOLS/TECHNIQUES
Plan Risk Responses TOOLS/TECHNIQUES ``` Expert Judgment Data Gathering Interpersonal & Team Skills Strategies for Threats Strategies for Opportunities Contingent Response Strategies Strategies for Overall Project Risk Data Analysis Decision Making ```
120
Plan Risk Responses OUTPUT
Plan Risk Responses OUTPUT Change Requests Project Management Plan Updates Project Documents Updates
121
Implement Risk Responses INPUT
Implement Risk Responses INPUT Project Management Plan Project Documents Organizational Process Assets
122
Implement Risk Responses TOOLS/TECHNIQUES
Implement Risk Responses TOOLS/TECHNIQUES Expert Judgment Interpersonal & Team Skills Project Management Information System
123
Implement Risk Responses OUTPUT
Implement Risk Responses OUTPUT Change Requests Project Documents Updates
124
Monitor Risks INPUT
Monitor Risks INPUT Project Management Plan Project Documents Work Performance Data Work Performance Reports
125
Monitor Risks TOOLS/TECHNIQUES
Monitor Risks TOOLS/TECHNIQUES Data Analysis Audits Meetings
126
Monitor Risks OUTPUT
Monitor Risks OUTPUT ``` Work Performance Information Change Requests Project Management Plan Updates Project Documents Updates Organizational Process Assets Updates ```
127
Plan Procurement Management INPUT
Plan Procurement Management INPUT ``` Project Charter Business Documents Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets ```
128
Plan Procurement Management TOOLS/TECHNIQUES
Plan Procurement Management TOOLS/TECHNIQUES ``` Expert Judgment Data Gathering Data Analysis Source Selection Analysis Meetings ```
129
Plan Procurement Management OUTPUT
Plan Procurement Management OUTPUT ``` Procurement Management Plan Procurement Strategy Bid Documents Procurement Statement of Work Source Selection Criteria Make-or-Buy Decisions Independent Cost Estimates Change Requests Project Documents Updates Organizational Process Assets Updates ```
130
Conduct Procurements INPUT
Conduct Procurements INPUT ``` Project Management Plan Project Documents Procurement Documentation Seller Proposals Enterprise Environmental Factors Organizational Process Assets ```
131
Conduct Procurements TOOLS/TECHNIQUES
Conduct Procurements TOOLS/TECHNIQUES ``` Expert Judgment Advertising Bidder Conferences Data Analysis Interpersonal & Team Skills ```
132
Conduct Procurements OUTPUT
Conduct Procurements OUTPUT ``` Selected Sellers Agreements Change Requests Project Management Plan Updates Project Documents Updates Organizational Process Assets Updates ```
133
Control Procurements INPUT
Control Procurements INPUT ``` Project Management Plan Project Documents Agreements Procurement Documentation Approved Change Requests Work Performance Data Enterprise Environmental Factors Organizational Process Assets ```
134
Control Procurements TOOLS/TECHNIQUES
Control Procurements TOOLS/TECHNIQUES ``` Expert Judgment Claims Administration Data Analysis Inspection Audits ```
135
Control Procurements OUTPUT
Control Procurements OUTPUT ``` Closed Procurements Work Performance Information Procurement Documentation Updates Change Requests Project Management Plan Updates Project Documents Updates Organizational Process Assets Updates ```
136
Identify Stakeholders INPUT
Identify Stakeholders INPUT ``` Project Charter Business Documents Project Management Plan Project Documents Agreements Enterprise Environmental Factors Organizational Process Assets ```
137
Identify Stakeholders TOOLS/TECHNIQUES
Identify Stakeholders TOOLS/TECHNIQUES ``` Expert Judgment Data Gathering Data Analysis Data Representation Meetings ```
138
Identify Stakeholders OUTPUT
Identify Stakeholders OUTPUT Stakeholder Register Change Requests Project Management Plan Updates Project Documents Updates
139
Plan Stakeholder Engagement INPUT
Plan Stakeholder Engagement INPUT ``` Project Charter Project Management Plan Project Documents Agreements Enterprise Environmental Factors Organizational Process Assets ```
140
Plan Stakeholder Engagement TOOLS/TECHNIQUES
Plan Stakeholder Engagement TOOLS/TECHNIQUES ``` Expert Judgment Data Gathering Data Analysis Decision Making Data Representation Meetings ```
141
Plan Stakeholder Engagement OUTPUT
Plan Stakeholder Engagement OUTPUT Stakeholder Engagement Plan
142
Manage Stakeholder Engagement INPUT
Manage Stakeholder Engagement INPUT Project Management Plan Project Documents Enterprise Environmental Factors Organizational Process Assets
143
Manage Stakeholder Engagement TOOLS/TECHNIQUES
Manage Stakeholder Engagement TOOLS/TECHNIQUES ``` Expert Judgment Communication Skills Interpersonal & Team Skills Ground Rules Meetings ```
144
Manage Stakeholder Engagement OUTPUT
Manage Stakeholder Engagement OUTPUT Change Requests Project Management Plan Updates Project Documents Updates
145
Monitor Stakeholder Engagement INPUT
Monitor Stakeholder Engagement INPUT ``` Project Management Plan Project Documents Work Performance Data Enterprise Environmental Factors Organizational Process Assets ```
146
Monitor Stakeholder Engagement TOOLS/TECHNIQUES
Monitor Stakeholder Engagement TOOLS/TECHNIQUES ``` Data Analysis Decision Making Data Representation Communication Skills Interpersonal & Team Skills Meetings ```
147
Monitor Stakeholder Engagement OUTPUT
Monitor Stakeholder Engagement OUTPUT Work Performance Information Change Requests Project Management Plan Updates Project Documents Updates