Intro To TS Flashcards

1
Q

What are the 5 sections of TS?

A
  1. Use and application 2. Safety limits 3. LCOs 4. Design features 5. Admin controls
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

List the safety limits.

A
  1. Fuel centerline temperature (modes 1 and 2)
  2. DNBR ratio (modes 1 and 2)
  3. PT limits (modes 1 and 2)
  4. RCS pressure < 2750# (modes 1-5)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What section of TS includes fuel storage requirements?

A

Design Features

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What section of TS includes staffing and procedure requirements?

A

Admin Controls

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What actions are required if RCS pressure at 2800#, power at 100% and reactor failed to trip?

A

Restore pressure < 2750#, mode 3 within 1 hour and notify NRC in 1 hour.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What actions are required if RCS pressure at 2755#, reactor tripped and RCS temperature at 300 degrees F?

A

Restore RCS pressure within 5 minutes and notify NRC in 1 hour.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

List the modes of operation.

A

1-6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the difference in a channel calibration and a channel check?

A

Calibration is adjustment while check is observation of proper operation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the formula for quadrant power tilt?

A

QPT = 100 * ((power in quadrant/avg power of all quadrants) - 1)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the definition of SD Margin?

A

Amount of rx that reactor is subcritical assuming all rods inserting except for rod with highest rod worth stuck out.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What actions are required when LCO 3.0.3 is met?

A

Within 1 hour - Mode 3 in 7 hours - Mode 4 in 13 hours - Mode 5 in 37 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is LCO 3.0.5 used for?

A

Equipment OOS or testing to prove operability of inoperable component

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What frequency are surveillance requirements required to be performed within per SR 3.0.2?

A

1.25x specified frequency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

If surveillance was discovered not performed during specified frequency how long can applicable LCO entry be delayed per SR 3.0.3?

A

Up to 24 hours or specified frequency of SR whichever is greater.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the applicability for TS 3.2.3 and 3.2.4 (Imbalance and QPT)?

A

Imbalance is applicable when power > 40% and QPT when power > 20%.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly