Order of operations in plumbing rough-ins

A
  1. DWV pipes drain by gravity and gt first choice of space
  2. Supply pipes (hot water and cold water)
  3. Gas piping
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

What does “roughing in” refer to?

A

Installing a component which will not be visible in the finished building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Who is the last to do their roughing in?

A

Electricians

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is a radiant barrier?

A

Thin sheets or panels with a bright metallic foil to block transmission of infrared heat. Installed over rafters are studs beneath the sheathing. They must be put in place during the framing of the building and are only effective if the bright service of the barrier faces a ventilated airspace.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What does a vapor retarder do?

A

Paper, metal foil, plastic, or primer paint placed on the warm side of thermal insulation to prevent water vapor from entering

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the airtight barrier approach?

… What method is a little easier?

A

Continuously placed gypsum board around interior condition spaces…

Simple caulk and seal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Why is millwork called millwork?

A

Because it is manufactured in a planing and molding mill

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Three grades of cabinetry set by the architectural woodwork institute

A

Economy, custom, and premium grade