Inspection Flashcards
What reasons have you carried out inspections?
Project Management of new development schemes
To assess and monitor Main Contractor site progress for store builds so that SOD targets can be met.
Describe matters that you consider in carrying out pre-inspection risk assessment
A. Guidance note. Surveying safely: health and safety principles for property professionals 2nd edition, 2018
Summary
I have regard section 6: Visiting sites
6.1. Before visiting
pre-assessment of hazards/risks likely to be encountered
including PPE requirement
Access arrangements with MC (occupier)
Site Rules and Welfare
-site induction
Condition of property
-Any areas defined as unsafe
Working from height
Cherry picker
Safety of scaffolding
FULL Answer
I have regard section 6: Visiting sites
6.1. Before visiting
pre-assessment of hazards/risks likely to be encountered
including PPE requirement
6.2 Checklist
Checklist of pre-inspection risks
-Travel - own transport. Safe car parking? park offsite?
Lone working
-Lidl’s specific requirements are that lone working doesnt take place
Condition of property
-Any areas defined as unsafe
Access arrangements with MC (occupier)
Site Rules and Welfare
-site induction
Working from height
Cherry picker
Safety of scaffolding
Roof - inspection via drone
Lidl’s roof spec
Monopitch supported by steel columns
Lidl’s wall spec
Cladding with brick or blockwork walls
Causes of damp in a building
Roof leak to condensation
What causes rising dam in building
Failed damp proof course. Damp proof course is the name given to the protective layer between your property and the external ground.
DPC should be 150mm (2 courses of brick above the external site ground level
What would lead you to consider dampness is caused by condensation
Black Mould
What are deleterious materials
Injurous to health or harm
- asbestos