Indian River Arch Bridge Project Flashcards

1
Q

What was the geographic situation of the Indian River bridge?

A

It was at a harbour entrance in Deleware

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What was the reason the existing bridge needed to be replaced?

A

The existing bridge had 2 in-river piers which were susceptible to strong currents and scour protection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What project delivery method was the new bridge?

A

Design-Bid-Build (Traditional)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What kind of process did DelDOT go through to select the bridge?

A

They held meetings with locals to get community input and designed the bridge with an eye to the natural surroundings of the area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What kind of bridge was selected before going out to bid?

A

A 1,000 foot concrete arch cable-supported bridge

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What happened when the bridge went out to bid?

A

Only one bidder came forward with a bid well over the budget

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What was the reason DelDOT received only one bid?

A

Because they had not considered construction feasibility - the bridge being so massive would require massive, very costly staging towers to just drop the pieces into place. Using the Traditional method meant contractors had no input in the design phase.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How would you respond to this tender request?

A

** your own answer **

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What other types of delivery methods may have helped prevent these issues that arose?

A

** your own answer **