High Rise Procedure Flashcards

1
Q

Additional difficulties that can be encountered when dealing with fires in high rise buildings:

(5)

A

Metabolic heat stress

Delays in firefighting and rescue operations

Communication difficulties

Fixed installations

Antisocial behaviour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The basic facilities provided within 50m buildings will include:

(3)

A

Firefighting shafts

Dry or wet rising mains

A fire lift

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where should a bridgehead be established?

A

Should be established at least 2 floors below the fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the following items of equipment that should be taken to the bridgehead?

(10)

A

45mm hose, sufficient to reach affected area

2 branches

1 BA entry control board

2 BA sets

IEC bag

Long line

Breaking-in gear

Thermal imaging camera

Access keys/codes

Floor plans if available

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the three sectors of a high rise?

A

Lobby sector

Fire sector

Search sector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly