Health and Safety Flashcards

1
Q

How much do injuries and health conditions caused in the construction industry cost, on average, per year in treatment and lost work hours?

A

£1.1 billion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the two most significant health and safety documents for this course?

A

CDM 2015

RIDDOR 2013

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the conditions that require HSE to be ‘notified’ of construction works?

A

More than 20 people are working simultaneously for over 30 days
Or
A total of 500 or more person-days of work is carried out

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When is the notice for a major project typically sent to the HSE?

A

After a tender option has been chosen

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When must a principle contractor be appointed?

A

When there are multiple contractors
Or
The project is notifiable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If a principle contractor is appointed, what else should occur?

A

A principle designer should be appointed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the 3 key health and safety documents?

A

Pre-construction documents
Construction H&S plan
H&S file

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What do pre-construction documents contain?

A

Maps and diagrams of services, existing structures, site plan, site investigation, list of key dates and key figures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What does a construction H&S plan contain? Who is responsible for producing it?

A

Produced by the contractor

Contains the risk assessment, training certificates and method statements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What does a H&S file contain? When is it delivered?

A

Delivered after construction is completed

Contains as-built drawings, descriptions of how the construction works and where any hazards and services exist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are not typically thought of in construction but must nonetheless be considered in health and safety documents?

A

Maintenance, repair, cleaning, refurbishment and demolition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is a hazard?

A

A potential source of harm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is a risk?

A

The chance that a hazard could cause harm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the principal designer’s health and safety responsibility?

A

Eliminate major hazards
Ensure designers carry out their duties
Provide relevant information to other dutyholders and the principal contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the contractor’s health and safety responsibility?

A

To control the hazards that exist to reduce risk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Whose safety is considered most important when designing safety measures?

A

The collective over the individual

17
Q

What kind of hazard does CDM 2015 schedule 3 detail?

A

Works that involve specific risks such as those requiring air supply, explosives, live electricity or harmful chemicals

18
Q

What does CDM 2015 schedule 2 list?

A

The welfare facilities that a site should provide for workers

19
Q

What is competence?

A

Having sufficient knowledge of tasks and risks involved

Experience and ability to carry out duties

20
Q

What does a method statement contain?

A

A list of the steps taken to complete a work including all hazards and the points at which they can arise

21
Q

What must be reported according to the RIDDOR 2013 guidelines?

A

Deaths, significant injuries, work related illnesses, near misses, injuries causing 7 or more days of lost work, hospitalisation of non workers

22
Q

If a worker is injured and unable to work for 3 consecutive days, what must happen?

A

The incident should be recorded, but it does not need to be reported until 7 consecutive days are exceeded

23
Q

What are the responsibilities of a principal contractor under CDM2015?

A

Plan, manage, monitor and coordinate health and safety
Preparing the construction phase plan
Ensure site inductions, suitable authorisation barriers, worker consultations and welfare facilities are all implemented

24
Q

Who is responsible for the health and safety file?

A

The principal Designer, unless their contract ends before the project completion, in which case it falls to the principal contractor to complete

25
Aside from CDM 15 and RIDDOR 2017, list 4 other health and safety regulation documents
Work at height regulations 2005 Control of asbestos regulations 2012 Gas safety regulations 1998 Regulatory reform order 2005
26
Who is generally responsible for notifying the HSE?
The client
27
According to CDM15 schedule 1, what must the HSE notification include?
``` Project Location Brief description Contact details Key dates Number of workers ```