HazMat Ops Bulletin 13 - Sheet1 Flashcards
From the HazMat Bulls
Technical Decontamination is performed on _________who are wearing personal protective equipment (PPE) and who have been exposed to an agent/ chemical that poses the risk of secondary contamination.
First Responders
From the HazMat Bulls
What companies are assigned to the Haz Mat Task Force 1____,2____,3_____,4____, and 5____
1.E6 2.E12 3.E26 4.T4 & 5.T15
From the HazMat Bulls
A minimum of ______personnnel shall be assigned to set up the Decon Corridor, and ______personnel shall be utilized for the decon process.
4 personnel 7 personnel
From the HazMat Bulls
According to Haz Mat Ops Bull 13, you should locate a protected large flat area; approximately ____x______ feet, which is adjacent to the hot zone.
100 x 100 feet
From the HazMat Bulls
According to Haz Mat Ops Bull 13, is this statement true or false. Selected area based on ground contour and direction of wind/ air flow. Up hill, up wind.
TRUE
From the HazMat Bulls
Decon corridor should be level or sloped towards ______zone entrance.
Hot zone
From the HazMat Bulls
According to Haz Mat Ops Bull 13, Entry and exits points shall be well marked with______.
Cones
From the HazMat Bulls
According to Haz Mat Ops Bull 13, Cones and fire line tape shall be utilized to identify perimeter outline ( Red Tape -_____side, Yellow tape -_____side.
Red tape=Dirty side Yellow tape=Clean side
From the HazMat Bulls
Personnel shall enter the decontamination (decon) corridor from the ______zone.
Hot zone
From the HazMat Bulls
According to Haz Mat Ops Bull 13, personnel shall enter the decon corridor, one at a time, starting with the person having the ________air supply.
Lowest supply
From the HazMat Bulls
According to Haz Mat Ops Bull 13, Decon team shall examine the protective clothing for breaches of suit (cut/ tears). If a breach is found, place________on breached area.
Chem-tape
From the HazMat Bulls
Decon team shall survey the entry team member visually and with meters, ____paper, _____paper to determine if all contamination is removed or reduced.
pH paper M8 paper
From the HazMat Bulls
According to Haz Mat Ops Bull 13, after metering for contaminates are complete, memeber shall step into ________Area.
Doffing Area
From the HazMat Bulls
According to Haz Mat Ops Bull 13, under the Weapon Decontamination section, weapons shall only be placed in a _____ bucket marked “weapons”.
5 gallon