H&S Questions Flashcards
What is the Pre-construction information pack?
A Pre-Construction Information Pack is included with the Tender Documents and provides information to bidding contractors on:
- Description of the project
- Client considerations and management requirements,
- Environmental restrictions and existing on site risks,
- Significant design and construction hazards,
- Information on the format / presentation of the health and safety file
Who is responsible for H&S?
The client is responsible for making arrangements for managing their project to ensure that health and safety risks are managed in a proportionate way. They must:
- Appoint competent duty holders.
- Allow sufficient time and resources.
- Prepare and provide relevant information to duty holders.
- Ensure that the Principal Designer and Contractor carry out their duties.
- Ensure welfare facilities.
What is included in a H&S file?
A) a brief description of the work carried out
B) any residual hazards which remain and how they have been dealt with (e.g surveys or info concerning asbestos; contaminated land; water bearing strata; buried services etc)
C) key structural principles and safe working loads for floors and roofs
D) hazardous materials used (for example lead paint; pesticides; special coatings which should not be burnt off etc);,
E) information regarding the removal or dismantling of installed plant and equipment (for example any special arrangements for lifting, order or other special instructions for dismantling etc)
F) health and safety information about equipment provided for cleaning or maintaining the structure
G) the nature, location and markings of significant services, including underground cables; gas supply equipment; fire-fighting services etc
H) information and as-built drawings of the structure, its plant and equipment
When is a BS a designer?
Under the CDM regulations, the BS is described as a ‘designer’ as they carry out work in connection with the structure or parts of the structure, make decisions on which materials will be used and on the preferred construction processes. There are five main responsibilities of designers
What is CDM?
Construction, design and management regulations
What is it and what does it mean?
Improves safety on site through design, planning and management
What do CDM regulations state?
Approved code of practice which gives advice on how to comply with HSE law.
Do CDM regulations apply to every project?
CDM Regulatons apply to all construction projects unless the client is domestic.
What is an F10?
Notification of a project to the HSE detailing numbers on site, location, which local authority it’s in, when, duration.
What are your responsibilities under CDM as a BS?
- Eliminate hazards and reduce risks during, design
- Provide information about remaining risks
- Check client is aware of their duties
- Check HSE has been notified,
- Provide any information needed for the health and safety file, by the end of the project
- Check own competence,
- Cooperate with others and coordinate work so as to ensure the health and safety of construction workers
What is the CSCS?
Construction Skills Certification Scheme
What safety precautions would you expect to see on site?
Accident book, site security, first aid, fire extinguishers, PPE, visitor sign in book (for fire evacuation)
What information do you have to provide the HSE with for a notifiable project?
Form F10 rev 1
If the principal designer is negligent who is responsible?
The Client, as they have to appoint someone competent.
Who is responsible for health and safety pre and post contract?
The Client
What can be done on site construction work to prevent accidents?
Trips, working at height, confined space, hot permits, joint fire code
If you see a sub-contractor not complying with safety regs, what would you do?
Tell them to stop and notify the contractor