The guide that supports the strike off bar is called a:

A

Screed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What term describes a form used to finish the side of a cast-in-place slab?

A

Edge form

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Pouring all members at once is called:

A

Monolithic placement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What form work component has a flexible bulb in the middle to resist shearing forces?

A

Water stop.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Who is responsible or preparing a plan for all form work that could cause injury?

A

Employer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Temporary support for loads during construction is called:

A

False work

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What must a form work designer sign before each concrete placement?

A

Field design.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Two factors that affect the pressure of form work:

A

Rate of placement, setting time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What type of form work is use in dam construction?

A

Cantilevered form work

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Purpose of a reglet is:

A

Allows space added to make area watertight.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Wastemold is form work that is:

A

Destroyed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the meaning of telegraphing?

A

When a defect is reproduced on the surface

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Why is a test block made

A

Show quality of finished concrete surface

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How is an exposed aggregate finish made?

A

Using gap graded aggregate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Why is tooling a concrete surface rarely done?

A

Too laborious.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How can you make a “site-made” Rustification strip?

A

Use wood free from knots.

17
Q

What are control joints ft?

A

Encourage cracks to follow these joint lines.

18
Q

Difference between isolation joint and control joint?

A

Isolation joints are used next to walls and around columns.