Who must design the support system and the stages of demolition before a building can be demolished?
Professional Engineer
What safety gear must a worker wear in demolishing a building
Boots, hard hat, eye protection, gloves
What services must be disconnected before a building can be demolished?
Electrical Water Gas Sewer Telephone
What height above adjacent levels are scaffolds required?
3m(10ft)
What is required when chutes are used to remove debris from a building?
Enclosed and gated if more than 45 degrees
Enclosed at both entry points
Should lead to truck or bin
When is hoarding required?
When demolition is next to a street or sidewalk
2 things that must be done when material is dropped from upper floors into a specified outside area.
Barricade where materials will land
Put up signs.
Why are hoardings constructed?
To protect people who are not working on the building site
According to the building code, how much height should a “covered walkway” have?
2.5m
Building construction poses a hazard to the public. A covered walkway is required if it is closer than __m to the public right of way?
2m
A covered hoarding must have a weather-tight roof that is…
Sloped toward the project.
Who determines whether hoarding is adequate and can begin construction or demolition?
Local Building Authority
2 Advantages of covered hoarding using arch-way scaffold supporting a concrete form panel roof.
Save on labour and Material
2 disadvantages of covered hoarding which uses archway scaffold supporting concrete form panel roof
Time consuming, if used for long period it is expensive.
If hoarding is placed on the street, it must be equipped with…
Warning Lights